Taft, TX Construction Projects

What's being built in Taft — 16 projects on file from Texas public records

16
Total Projects
$83.3M
Total Investment
13
New Construction
3
Renovations
262K
Total Sq Ft
$5.2M
Avg. Value

What is being built in Taft, Texas?

Taft, Texas has 16 construction and development projects on file worth $83.3M — 13 new construction and 3 renovations or remodels, 2 of them filed in the last six months. Each record is a real filing from Texas public construction records and names the project, its declared value and the date it was registered.

What new businesses are coming to Taft?

The most recently filed new-construction projects in Taft are Cross Point Veterinary Clinic ($2.5M), Stipes 42896 Taft, TX ($1.4M), Sunterra Phases 1-4 Playground Improvements (Section 2) ($135K), New Concession Stand Building ($400K). A new-construction filing is the earliest public signal that something new is being built, usually well before it opens, so this list leads street-level visibility rather than following it.

San Patricio County Economy

Driving Taft construction · FRED

Unemployment:5.0%
Zabalist / visual intelligence

See the shape of development

Compare project scale, registration dates, and locations across 16 loaded TDLR filings. This is the loaded selection, not a measure of every project in the market.

Taft
Estimated construction value$83.3MSum of 16 shown records with value
Records in view16 / 16Ready to inspect and compare
Largest record’s share60%Share of reported value shown
01

Where the value sits

Area = reported value
Select a block to inspect0 without reported value · Smaller records grouped
Taft

Comparisons use only these 16 records. Missing values are excluded from totals. Recorded value is not revenue or a quality rating.

Construction & Development in Taft, Texas

Taft is experiencing significant construction and development activity with 16 registered projects valued at $83.3M. The city's development portfolio includes 13 new construction projects and 3 renovation projects, representing 261,636 square feet of built space across commercial, residential, and mixed-use developments.

Development Activity

  • 13 new construction projects (81%)
  • 3 renovation/remodel projects (19%)
  • Average project value: $5.2M
  • 2 new projects in last 6 months

Key Players

Taft's construction market features 4 major property owners and 5 active design firms driving development across the city.

Leading developers include Taft Independent School District and Green Hat Properties, LLC, working with architecture firms such as gignac associates and Gignac Architects.

Our database tracks all TDLR-registered construction projects in Taft. Projects span Travis and Waller and San Patricio counties, providing comprehensive coverage of commercial construction, residential development, and infrastructure improvements throughout Taft and the surrounding area.

2 New Projects
Registered in the last 6 months

All Projects

16 TDLR · 0 Site Plans

Showing 16 of 16 listed TDLR filings

Closed
$895K

Taft Library

515 Green Ave, Taft, TX 78390

4,502 sqftJun 21, 2024

Taft construction questions

How many construction projects are there in Taft, Texas?
There are 16 registered construction projects in Taft, Texas with a total estimated value of $83.3M and 261,636 square feet of development. The average project is valued at $5.2M.
What kind of construction is happening in Taft?
Taft has 13 new construction projects (81%) and 3 renovation or remodel projects (19%) on file, together totaling 261,636 square feet. Work spans commercial, residential and mixed-use development.
Who is building in Taft?
The most active property owners on file in Taft are Taft Independent School District, Green Hat Properties, LLC, TAFT ISD. The architecture and design firms appearing most often on Taft filings are gignac associates, Gignac Architects, Luddeke ADG, Inc..
Where does this Taft construction data come from?
Every project on this page is a TDLR-registered construction filing from Texas public records, not an estimate or a listing. Each entry keeps the project name, declared value, owner and registration date exactly as filed, which is why a project can appear here months before any visible work starts on site.

Figures on this page are counted from the Taft filings themselves and change as new records are registered. How Zabalist sources Texas construction records.