Property Owner1 not closed in shown records

Bryteside Investments LLC

760 Moss Glen Dr., Prosper, Texas 75078

The profile totals use the available portfolio summary. Status, work type, square footage, and location breakdowns below use 1 loaded filings. A record not marked closed does not establish ongoing construction; filing values can describe overlapping scopes.

1
Total Projects
$3.0M
Portfolio Value
1
Not closed · shown
14,600
Sq ft · shown
1
Cities · shown
$3.0M
Avg disclosed · shown

Claim this profile

Add your logo, contact info, and a lead capture form. From $29/mo.

Track this company

Get an email alert the next time Bryteside Investments LLC files a new project.

Export full work history

Download Bryteside Investments LLC's complete project record — and companies like it — as a CSV.

Browse data lists
Related to Bryteside Investments LLC

The 500 highest-value construction entities in Texas, ranked

500 recordsCSV download, updated monthly
$199
Subscribers save up to 25% — see plans · view all fields

About Bryteside Investments LLC

Bryteside Investments LLC is named as an owner in 1 construction filings in the Dallas-Fort Worth area, with a reported portfolio value of $3.0M. The 1 loaded filings include 1 new construction records and 0 renovation/alteration records, representing 14,600 square feet of reported floor area. These filings do not establish completed development or current property ownership.

Work Items

  • 1 new construction projects (100%)
  • 0 renovation projects (0%)
  • Average disclosed value in shown filings: $3.0M
  • Square footage in shown records: 14,600 sq ft

Market Presence

  • Mckinney1 projects

Among these 1 loaded filings, 1 have a reported status other than Project Closed and 0 are marked Project Closed. The records cover 1 cities and name design firms including Colliers Engineering & Design. These are filing statuses, not independent observations of work on site.

Activity Over Time

2026
1
Median project: $3.0MAvg cost/sqft: $205/sqftPeak year: 2026 (1 projects)

Activity Timeline

First Project
Oct 2026
Latest Project
Oct 2026
1
Not closed
0
Source closed

Project Locations

Design Partners

1 architecture firms

1 total design firms worked with$3.0M combined

Project Status

Registered
1(100%)

All Projects

1 total · Sorted by date