Property Owner1 not closed in shown records

Domain Mall, LLC

11410 Center Oaks Terrace, Suite 210, Austin, Texas 78758
Scott Budge

The profile totals use the available portfolio summary. Status, work type, square footage, and location breakdowns below use 3 loaded filings. A record not marked closed does not establish ongoing construction; filing values can describe overlapping scopes.

3
Total Projects
$8.7M
Portfolio Value
1
Not closed · shown
19,281
Sq ft · shown
1
Cities · shown
$2.9M
Avg disclosed · shown

Claim this profile

Add your logo, contact info, and a lead capture form. From $29/mo.

Track this company

Get an email alert the next time Domain Mall, LLC files a new project.

Export full work history

Download Domain Mall, LLC's complete project record — and companies like it — as a CSV.

Browse data lists
Related to Domain Mall, LLC

Every developer and owner with an active site plan in Travis County

350+ recordsCSV download, updated monthly
$129
Subscribers save up to 25% — see plans · view all fields

About Domain Mall, LLC

Domain Mall, LLC is named as an owner in 3 construction filings in the Austin-Central Texas area, with a reported portfolio value of $8.7M. The 3 loaded filings include 0 new construction records and 3 renovation/alteration records, representing 19,281 square feet of reported floor area. These filings do not establish completed development or current property ownership.

Work Items

  • 0 new construction projects (0%)
  • 3 renovation projects (100%)
  • Average disclosed value in shown filings: $2.9M
  • Square footage in shown records: 19,281 sq ft

Market Presence

  • Austin3 projects

Among these 3 loaded filings, 1 have a reported status other than Project Closed and 2 are marked Project Closed. The records cover 1 cities and name design firms including Winick Architects, Interplan LLC. These are filing statuses, not independent observations of work on site.

Activity Over Time

2022
1
2024
2
Median project: $2.1MAvg cost/sqft: $445/sqftPeak year: 2024 (2 projects)

Activity Timeline

First Project
Aug 2022
Latest Project
Jul 2024
1
Not closed
2
Source closed

Project Locations

Design Partners

2 architecture firms

2 total design firms worked with$6.5M combined

Project Status

Closed
2(67%)
Inspection Complete
1(33%)