Property Owner4 not closed in shown records

FHF I LAMAR UNION LLC

One Federal Street 17th Floor, Boston, Massachusetts 02211
Brooks Wales

The profile totals use the available portfolio summary. Status, work type, square footage, and location breakdowns below use 4 loaded filings. A record not marked closed does not establish ongoing construction; filing values can describe overlapping scopes.

4
Total Projects
$1.9M
Portfolio Value
4
Not closed · shown
10,483
Sq ft · shown
1
Cities · shown
$473K
Avg disclosed · shown

Claim this profile

Add your logo, contact info, and a lead capture form. From $29/mo.

Track this company

Get an email alert the next time FHF I LAMAR UNION LLC files a new project.

Export full work history

Download FHF I LAMAR UNION LLC's complete project record — and companies like it — as a CSV.

Browse data lists
Related to FHF I LAMAR UNION LLC

Every developer and owner with an active site plan in Travis County

350+ recordsCSV download, updated monthly
$129
Subscribers save up to 25% — see plans · view all fields

About FHF I LAMAR UNION LLC

FHF I LAMAR UNION LLC is named as an owner in 4 construction filings in the Austin-Central Texas area, with a reported portfolio value of $1.9M. The 4 loaded filings include 0 new construction records and 3 renovation/alteration records, representing 10,483 square feet of reported floor area. These filings do not establish completed development or current property ownership.

Work Items

  • 0 new construction projects (0%)
  • 3 renovation projects (75%)
  • Average disclosed value in shown filings: $473K
  • Square footage in shown records: 10,483 sq ft

Market Presence

  • Austin4 projects

Among these 4 loaded filings, 4 have a reported status other than Project Closed and 0 are marked Project Closed. The records cover 1 cities and name design firms including JDAI STUDIO, AO, HUO ARCHITECTS. These are filing statuses, not independent observations of work on site.

Activity Over Time

2016
1
2025
2
2026
1
Median project: $550KAvg cost/sqft: $127/sqftPeak year: 2025 (2 projects)

Activity Timeline

First Project
Feb 2016
Latest Project
Mar 2026
4
Not closed
0
Source closed

Project Locations

Design Partners

3 architecture firms

3 total design firms worked with$1.9M combined

Project Status

Inspection Complete
2(50%)
Registered
1(25%)
Review Complete
1(25%)