Property Owner1 not closed in shown records

First Metric LTD

2705 Bee Caves Road Suite 230, Austin, Texas 78746
Rhonda Jaquez

The profile totals use the available portfolio summary. Status, work type, square footage, and location breakdowns below use 3 loaded filings. A record not marked closed does not establish ongoing construction; filing values can describe overlapping scopes.

3
Total Projects
$3.9M
Portfolio Value
1
Not closed · shown
21,343
Sq ft · shown
1
Cities · shown
$1.3M
Avg disclosed · shown

Claim this profile

Add your logo, contact info, and a lead capture form. From $29/mo.

Track this company

Get an email alert the next time First Metric LTD files a new project.

Export full work history

Download First Metric LTD's complete project record — and companies like it — as a CSV.

Browse data lists
Related to First Metric LTD

Every developer and owner with an active site plan in Travis County

350+ recordsCSV download, updated monthly
$129
Subscribers save up to 25% — see plans · view all fields

About First Metric LTD

First Metric LTD is named as an owner in 3 construction filings in the Austin-Central Texas area, with a reported portfolio value of $3.9M. The 3 loaded filings include 0 new construction records and 3 renovation/alteration records, representing 21,343 square feet of reported floor area. These filings do not establish completed development or current property ownership.

Work Items

  • 0 new construction projects (0%)
  • 3 renovation projects (100%)
  • Average disclosed value in shown filings: $1.3M
  • Square footage in shown records: 21,343 sq ft

Market Presence

  • Austin3 projects

Among these 3 loaded filings, 1 have a reported status other than Project Closed and 2 are marked Project Closed. The records cover 1 cities and name design firms including Framework Architects, OPN Architects, Inc.. These are filing statuses, not independent observations of work on site.

Activity Over Time

2024
1
2025
2
Median project: $400KAvg cost/sqft: $210/sqftPeak year: 2025 (2 projects)

Activity Timeline

First Project
Oct 2024
Latest Project
Dec 2025
1
Not closed
2
Source closed

Project Locations

Project Status

Closed
2(67%)
Inspection Complete
1(33%)