Property Owner2 not closed in shown records

HH-CH-B Blue Lake LLC

1111 W. 11th Street, Austin, Texas 78703
Leisha Ehlert

The profile totals use the available portfolio summary. Status, work type, square footage, and location breakdowns below use 2 loaded filings. A record not marked closed does not establish ongoing construction; filing values can describe overlapping scopes.

2
Total Projects
$11.8M
Portfolio Value
2
Not closed · shown
15,090
Sq ft · shown
1
Cities · shown
$5.9M
Avg disclosed · shown

Claim this profile

Add your logo, contact info, and a lead capture form. From $29/mo.

Track this company

Get an email alert the next time HH-CH-B Blue Lake LLC files a new project.

Export full work history

Download HH-CH-B Blue Lake LLC's complete project record — and companies like it — as a CSV.

Browse data lists
Related to HH-CH-B Blue Lake LLC

Every company tracking $10M+ in active construction project value

11,000+ recordsCSV download, updated monthly
$299
Subscribers save up to 25% — see plans · view all fields

About HH-CH-B Blue Lake LLC

HH-CH-B Blue Lake LLC is named as an owner in 2 construction filings in the Austin-Central Texas area, with a reported portfolio value of $11.8M. The 2 loaded filings include 2 new construction records and 0 renovation/alteration records, representing 15,090 square feet of reported floor area. These filings do not establish completed development or current property ownership.

Work Items

  • 2 new construction projects (100%)
  • 0 renovation projects (0%)
  • Average disclosed value in shown filings: $5.9M
  • Square footage in shown records: 15,090 sq ft

Market Presence

  • Spicewood2 projects

Among these 2 loaded filings, 2 have a reported status other than Project Closed and 0 are marked Project Closed. The records cover 1 cities and name design firms including Hart Howerton Partners Ltd., Hart Howerton Partners, Ltd.. These are filing statuses, not independent observations of work on site.

Activity Over Time

2025
2
Median project: $11.3MAvg cost/sqft: $565/sqftPeak year: 2025 (2 projects)

Activity Timeline

First Project
Mar 2025
Latest Project
Jul 2025
2
Not closed
0
Source closed

Project Locations

Design Partners

2 architecture firms

2 total design firms worked with$11.8M combined

Project Status

Review Complete
2(100%)