Property Owner6 not closed in shown records

Irving Hospital Authority

301 N Washington Ave Suite 700, Dallas, Texas 75246
J. Mark Fryar

The profile totals use the available portfolio summary. Status, work type, square footage, and location breakdowns below use 8 loaded filings. A record not marked closed does not establish ongoing construction; filing values can describe overlapping scopes.

8
Total Projects
$2.7M
Portfolio Value
6
Not closed · shown
25,880
Sq ft · shown
2
Cities · shown
$335K
Avg disclosed · shown

Claim this profile

Add your logo, contact info, and a lead capture form. From $29/mo.

Track this company

Get an email alert the next time Irving Hospital Authority files a new project.

Export full work history

Download Irving Hospital Authority's complete project record — and companies like it — as a CSV.

Browse data lists
Related to Irving Hospital Authority

The 500 highest-value construction entities in Texas, ranked

500 recordsCSV download, updated monthly
$199
Subscribers save up to 25% — see plans · view all fields

About Irving Hospital Authority

Irving Hospital Authority is named as an owner in 8 construction filings in the Dallas-Fort Worth area, with a reported portfolio value of $2.7M. The 8 loaded filings include 0 new construction records and 8 renovation/alteration records, representing 25,880 square feet of reported floor area. These filings do not establish completed development or current property ownership.

Work Items

  • 0 new construction projects (0%)
  • 8 renovation projects (100%)
  • Average disclosed value in shown filings: $335K
  • Square footage in shown records: 25,880 sq ft

Market Presence

  • Irving7 projects
  • Dallas1 projects

Among these 8 loaded filings, 6 have a reported status other than Project Closed and 2 are marked Project Closed. The records cover 2 cities and name design firms including GUIDE Architecture, Schwabauer Design, ENTOS Design. These are filing statuses, not independent observations of work on site.

Activity Over Time

2022
1
2024
1
2025
3
2026
3
Median project: $217KAvg cost/sqft: $340/sqftPeak year: 2025 (3 projects)

Activity Timeline

First Project
Jul 2022
Latest Project
May 2026
6
Not closed
2
Source closed

Project Locations

Project Status

Review Complete
3(38%)
Inspection Complete
2(25%)
Closed
2(25%)
Registered
1(13%)