Project intelligenceTDLR EABPRJA9800851Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

SAC CIP PHASE II - NAIL TECHNICAL CENTER in San Antonio, TX

1300 SAN PEDRO, San Antonio, TX, 78212

Construction complete · Dec 2010Project Closed

SAC CIP PHASE II - NAIL TECHNICAL CENTER is a renovation/alteration project at 1300 SAN PEDRO, San Antonio, in Bexar County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Dec 2010). The project has an estimated value of $7.5M.

Estimated project value
$7.5M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
Not supplied
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
—
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
2 years
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Sep 16, 2008806 days across supplied datesDec 1, 2010

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    76 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    730 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 78212 (San Antonio)

One email per change. Unsubscribe in one click. Privacy.

SAC CIP PHASE II - NAIL TECHNICAL CENTER is a Renovation/Alteration project located at 1300 SAN PEDRO, San Antonio, TX 78212 in San Antonio, Texas. The project has an estimated value of $7.5M. ALAMO COMMUNITY COLLEGES is the property owner and O'CONNELL ROBERTSON is the design firm of record. The project was registered with TDLR on September 16, 2008.

Frequently Asked Questions

What is SAC CIP PHASE II - NAIL TECHNICAL CENTER?

SAC CIP PHASE II - NAIL TECHNICAL CENTER is a renovation/alteration project at 1300 SAN PEDRO in San Antonio, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Exterior and interior renovation to an existing buildingon the campus. Complete MEP make-over and addition of

Is SAC CIP PHASE II - NAIL TECHNICAL CENTER open in San Antonio?

Construction on SAC CIP PHASE II - NAIL TECHNICAL CENTER is complete — TDLR records show the project passed its required accessibility inspection in Dec 2010. The building is finished and very likely open.

Where is SAC CIP PHASE II - NAIL TECHNICAL CENTER located?

SAC CIP PHASE II - NAIL TECHNICAL CENTER is located at 1300 SAN PEDRO, San Antonio, TX, 78212, in Bexar County.

Who is the owner or developer of SAC CIP PHASE II - NAIL TECHNICAL CENTER?

ALAMO COMMUNITY COLLEGES is the property owner/developer of record for SAC CIP PHASE II - NAIL TECHNICAL CENTER, per its TDLR project registration.

Who is the architect or design firm for SAC CIP PHASE II - NAIL TECHNICAL CENTER?

O'CONNELL ROBERTSON is the design firm of record for SAC CIP PHASE II - NAIL TECHNICAL CENTER, according to its TDLR filing.

How much does SAC CIP PHASE II - NAIL TECHNICAL CENTER cost and how big is it?

SAC CIP PHASE II - NAIL TECHNICAL CENTER has an estimated construction value of $7.5M, based on its TDLR filing.

Scope of Work

Exterior and interior renovation to an existing buildingon the campus. Complete MEP make-over and addition of

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

1300 SAN PEDRO, San Antonio, TX, 78212

Loading location map…
29.44557, -98.49928

Watch all construction in 78212 (San Antonio)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in San Antonio?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.