Project intelligenceTDLR EABPRJB1805437New Construction
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

ORANGE CENTRAL FIRE STATION, #1

501 7TH STREET, Orange, TX, 77630

Construction complete · Oct 2011Project Closed

ORANGE CENTRAL FIRE STATION, #1 is a new construction project at 501 7TH STREET, Orange, in Orange County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Oct 2011). The project has an estimated value of $4.0M.

Estimated project value
$4.0M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
Not supplied
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
—
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
8 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Dec 31, 2010274 days across supplied datesOct 1, 2011

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    32 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    242 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 77630 (Orange)

One email per change. Unsubscribe in one click. Privacy.

ORANGE CENTRAL FIRE STATION, #1 is a New Construction project located at 501 7TH STREET, Orange, TX 77630 in Orange, Texas. The project has an estimated value of $4.0M. CITY OF ORANGE is the property owner and BROWN REYNOLDS WATFORD ARCHITECTS is the design firm of record. The project was registered with TDLR on December 31, 2010.

Frequently Asked Questions

What is ORANGE CENTRAL FIRE STATION, #1?

ORANGE CENTRAL FIRE STATION, #1 is a new construction project at 501 7TH STREET in Orange, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: a new 21824 sf fire station include sleeping quarters and common areas

Is ORANGE CENTRAL FIRE STATION, #1 open in Orange?

Construction on ORANGE CENTRAL FIRE STATION, #1 is complete — TDLR records show the project passed its required accessibility inspection in Oct 2011. The building is finished and very likely open.

Where is ORANGE CENTRAL FIRE STATION, #1 located?

ORANGE CENTRAL FIRE STATION, #1 is located at 501 7TH STREET, Orange, TX, 77630, in Orange County.

Who is the owner or developer of ORANGE CENTRAL FIRE STATION, #1?

CITY OF ORANGE is the property owner/developer of record for ORANGE CENTRAL FIRE STATION, #1, per its TDLR project registration.

Who is the architect or design firm for ORANGE CENTRAL FIRE STATION, #1?

BROWN REYNOLDS WATFORD ARCHITECTS is the design firm of record for ORANGE CENTRAL FIRE STATION, #1, according to its TDLR filing.

How much does ORANGE CENTRAL FIRE STATION, #1 cost and how big is it?

ORANGE CENTRAL FIRE STATION, #1 has an estimated construction value of $4.0M, based on its TDLR filing.

Scope of Work

a new 21824 sf fire station include sleeping quarters and common areas

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

501 7TH STREET, Orange, TX, 77630

Loading location map…
30.09417, -93.73672

Watch all construction in 77630 (Orange)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.