5 FITNESS TRAINING AND YOGA is a renovation/alteration project at 2145 BEE CAVES RD STE 105, Rollingwood, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Oct 2011). The project has an estimated value of $100K.
Project has been completed and closed
5 FITNESS TRAINING AND YOGA is a Renovation/Alteration project located at 2145 BEE CAVES RD STE 105, Rollingwood, TX 78746 in Rollingwood, Texas. The project has an estimated value of $100K. LIVE OAK is the property owner and EDWARD B FRIERSON AIA ARCHITECT is the design firm of record. The project was registered with TDLR on September 8, 2011.
5 FITNESS TRAINING AND YOGA is a renovation/alteration project at 2145 BEE CAVES RD STE 105 in Rollingwood, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: TENANT FINISH OUT OF EXISTING SPACE W/ EXISTING RSTRMSBEING REUSED. SPC IS FOR PHYSICAL TRAINING
Construction on 5 FITNESS TRAINING AND YOGA is complete โ TDLR records show the project passed its required accessibility inspection in Oct 2011. The building is finished and very likely open.
5 FITNESS TRAINING AND YOGA is located at 2145 BEE CAVES RD STE 105, Rollingwood, TX, 78746, in Travis County.
LIVE OAK is the property owner/developer of record for 5 FITNESS TRAINING AND YOGA, per its TDLR project registration.
EDWARD B FRIERSON AIA ARCHITECT is the design firm of record for 5 FITNESS TRAINING AND YOGA, according to its TDLR filing.
5 FITNESS TRAINING AND YOGA has an estimated construction value of $100K, based on its TDLR filing.
TENANT FINISH OUT OF EXISTING SPACE W/ EXISTING RSTRMSBEING REUSED. SPC IS FOR PHYSICAL TRAINING
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Sep 8, 2011
Review Complete
Inspection Complete
Closed
Oct 1, 2011
Building permits found at or near this location
8.91 kW solar installation
Express: Foundation Repair
New Irrigation System Install
New 2 story SFR with 4 bedrooms 2.5 bathrooms attached garage and covered patio.
Construct 160 LF new sidewalk for (2) sidewalks - corner lot with ADA ramps and 12 driveway approach. Shall meet all city standards. **kr
Active businesses near this construction site
Business data from Google