Project intelligenceTDLR EABPRJB2807001Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

MOODY LEARNING CENTER - PHASE III REN.

1300 SAN PEDRO AVE. Building 24, San Antonio, TX, 78212

Construction complete · Nov 2013Project Closed

MOODY LEARNING CENTER - PHASE III REN. is a renovation/alteration project at 1300 SAN PEDRO AVE. Building 24, San Antonio, in Bexar County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Nov 2013). The project has an estimated value of $15.3M.

Estimated project value
$15.3M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
Not supplied
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1y 9mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Jan 27, 2012644 days across supplied datesNov 1, 2013

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    5 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    639 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 78212 (San Antonio)

One email per change. Unsubscribe in one click. Privacy.

MOODY LEARNING CENTER - PHASE III REN. is a Renovation/Alteration project located at 1300 SAN PEDRO AVE. Building 24, San Antonio, TX 78212 in San Antonio, Texas. The project has an estimated value of $15.3M. JOHN STRYBOS ( ALAMO COLLEGES ) is the property owner and O'CONNELL ROBERTSON is the design firm of record. The project was registered with TDLR on January 27, 2012.

Frequently Asked Questions

What is MOODY LEARNING CENTER - PHASE III REN.?

MOODY LEARNING CENTER - PHASE III REN. is a renovation/alteration project at 1300 SAN PEDRO AVE. Building 24 in San Antonio, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Demolition of existing conditions, interior renovations,major HVAC, Electrical and Plumbing renovations, escala

Is MOODY LEARNING CENTER - PHASE III REN. open in San Antonio?

Construction on MOODY LEARNING CENTER - PHASE III REN. is complete — TDLR records show the project passed its required accessibility inspection in Nov 2013. The building is finished and very likely open.

Where is MOODY LEARNING CENTER - PHASE III REN. located?

MOODY LEARNING CENTER - PHASE III REN. is located at 1300 SAN PEDRO AVE. Building 24, San Antonio, TX, 78212, in Bexar County.

Who is the owner or developer of MOODY LEARNING CENTER - PHASE III REN.?

JOHN STRYBOS ( ALAMO COLLEGES ) is the property owner/developer of record for MOODY LEARNING CENTER - PHASE III REN., per its TDLR project registration.

Who is the architect or design firm for MOODY LEARNING CENTER - PHASE III REN.?

O'CONNELL ROBERTSON is the design firm of record for MOODY LEARNING CENTER - PHASE III REN., according to its TDLR filing.

How much does MOODY LEARNING CENTER - PHASE III REN. cost and how big is it?

MOODY LEARNING CENTER - PHASE III REN. has an estimated construction value of $15.3M, based on its TDLR filing.

Scope of Work

Demolition of existing conditions, interior renovations,major HVAC, Electrical and Plumbing renovations, escala

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

1300 SAN PEDRO AVE. Building 24, San Antonio, TX, 78212

29.44557, -98.49928

Watch all construction in 78212 (San Antonio)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in San Antonio?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.