BAKER O'BRIEN
BAKER O'BRIEN is a renovation/alteration project at 12001 N. CENTRAL EXPRESSWAY Suite 1200, Dallas, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jul 2012). The project has an estimated value of $60K.
๐Project Metrics
TDLR #EABPRJB2811877Project Closed
Project has been completed and closed
BAKER O'BRIEN is a Renovation/Alteration project located at 12001 N. CENTRAL EXPRESSWAY Suite 1200, Dallas, TX 75243 in Dallas, Texas. The project has an estimated value of $60K. RPD CATALYST is the property owner and ENTOS DESIGN is the design firm of record. The project was registered with TDLR on April 25, 2012.
โFrequently Asked Questions
What is BAKER O'BRIEN?
BAKER O'BRIEN is a renovation/alteration project at 12001 N. CENTRAL EXPRESSWAY Suite 1200 in Dallas, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Renovation to existing floor to create multi tenant suite and corridor
Is BAKER O'BRIEN open in Dallas?
Construction on BAKER O'BRIEN is complete โ TDLR records show the project passed its required accessibility inspection in Jul 2012. The building is finished and very likely open.
Where is BAKER O'BRIEN located?
BAKER O'BRIEN is located at 12001 N. CENTRAL EXPRESSWAY Suite 1200, Dallas, TX, 75243, in Dallas County.
Who is the owner or developer of BAKER O'BRIEN?
RPD CATALYST is the property owner/developer of record for BAKER O'BRIEN, per its TDLR project registration.
Who is the architect or design firm for BAKER O'BRIEN?
ENTOS DESIGN is the design firm of record for BAKER O'BRIEN, according to its TDLR filing.
How much does BAKER O'BRIEN cost and how big is it?
BAKER O'BRIEN has an estimated construction value of $60K, based on its TDLR filing.
๐Scope of Work
Renovation to existing floor to create multi tenant suite and corridor
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Apr 25, 2012
Review Complete
Inspection Complete
Closed
Jul 1, 2012