SH 149
SH 149 is a renovation/alteration project at AT SABINE RIVER and Massey Branch, Lakeport, in Gregg County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Apr 2018). The project has an estimated value of $235K.
๐Project Metrics
TDLR #EABPRJB5812342Project Closed
Project has been completed and closed
SH 149 is a Renovation/Alteration project located at AT SABINE RIVER and Massey Branch, Lakeport, TX 75603 in Lakeport, Texas. The project has an estimated value of $235K. TXDOT DISTRICT: TYLER is the property owner and TXDOT is the design firm of record. The project was registered with TDLR on March 24, 2015.
โFrequently Asked Questions
What is SH 149?
SH 149 is a renovation/alteration project at AT SABINE RIVER and Massey Branch in Lakeport, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Concrete bridge rail, MBGF, concrete structure repair
Is SH 149 open in Lakeport?
Construction on SH 149 is complete โ TDLR records show the project passed its required accessibility inspection in Apr 2018. The building is finished and very likely open.
Where is SH 149 located?
SH 149 is located at AT SABINE RIVER and Massey Branch, Lakeport, TX, 75603, in Gregg County.
Who is the owner or developer of SH 149?
TXDOT DISTRICT: TYLER is the property owner/developer of record for SH 149, per its TDLR project registration.
Who is the architect or design firm for SH 149?
TXDOT is the design firm of record for SH 149, according to its TDLR filing.
How much does SH 149 cost and how big is it?
SH 149 has an estimated construction value of $235K, based on its TDLR filing.
๐Scope of Work
Concrete bridge rail, MBGF, concrete structure repair
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Mar 24, 2015
Review Complete
Inspection Complete
Closed
Apr 1, 2018