SPEC SUITE 120
SPEC SUITE 120 is a renovation/alteration project at 5601 DEMOCRACY DRIVE Suite 120, Plano, in Collin County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jan 2016). The project has an estimated value of $62K.
๐Project Metrics
TDLR #EABPRJB6802394Project Closed
Project has been completed and closed
SPEC SUITE 120 is a Renovation/Alteration project located at 5601 DEMOCRACY DRIVE Suite 120, Plano, TX 75024 in Plano, Texas. The project has an estimated value of $62K. TRANSWESTERN is the property owner and ENTOS DESIGN is the design firm of record. The project was registered with TDLR on October 8, 2015.
โFrequently Asked Questions
What is SPEC SUITE 120?
SPEC SUITE 120 is a renovation/alteration project at 5601 DEMOCRACY DRIVE Suite 120 in Plano, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Renovation of existing space with new walls, doors, millwork and finishes
Is SPEC SUITE 120 open in Plano?
Construction on SPEC SUITE 120 is complete โ TDLR records show the project passed its required accessibility inspection in Jan 2016. The building is finished and very likely open.
Where is SPEC SUITE 120 located?
SPEC SUITE 120 is located at 5601 DEMOCRACY DRIVE Suite 120, Plano, TX, 75024, in Collin County.
Who is the owner or developer of SPEC SUITE 120?
TRANSWESTERN is the property owner/developer of record for SPEC SUITE 120, per its TDLR project registration.
Who is the architect or design firm for SPEC SUITE 120?
ENTOS DESIGN is the design firm of record for SPEC SUITE 120, according to its TDLR filing.
How much does SPEC SUITE 120 cost and how big is it?
SPEC SUITE 120 has an estimated construction value of $62K, based on its TDLR filing.
๐Scope of Work
Renovation of existing space with new walls, doors, millwork and finishes
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Oct 8, 2015
Review Complete
Inspection Complete
Closed
Jan 1, 2016