SSRH - CLINIC RENOVATION
SSRH - CLINIC RENOVATION is a renovation/alteration project at 800 EAST HIGHWAY 71, Smithville, in Bastrop County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jul 2016). The project has an estimated value of $1.4M.
๐Project Metrics
TDLR #EABPRJB6810900Project Closed
Project has been completed and closed
SSRH - CLINIC RENOVATION is a Renovation/Alteration project located at 800 EAST HIGHWAY 71, Smithville, TX 78957 in Smithville, Texas. The project has an estimated value of $1.4M. SETON HEALTHCARE FAMILY is the property owner and O'CONNELL ROBERTSON is the design firm of record. The project was registered with TDLR on February 26, 2016.
โFrequently Asked Questions
What is SSRH - CLINIC RENOVATION?
SSRH - CLINIC RENOVATION is a renovation/alteration project at 800 EAST HIGHWAY 71 in Smithville, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: The project consists of renovating approximately 9,000sfof the existing hospital to be a separate clinic.
Is SSRH - CLINIC RENOVATION open in Smithville?
Construction on SSRH - CLINIC RENOVATION is complete โ TDLR records show the project passed its required accessibility inspection in Jul 2016. The building is finished and very likely open.
Where is SSRH - CLINIC RENOVATION located?
SSRH - CLINIC RENOVATION is located at 800 EAST HIGHWAY 71, Smithville, TX, 78957, in Bastrop County.
Who is the owner or developer of SSRH - CLINIC RENOVATION?
SETON HEALTHCARE FAMILY is the property owner/developer of record for SSRH - CLINIC RENOVATION, per its TDLR project registration.
Who is the architect or design firm for SSRH - CLINIC RENOVATION?
O'CONNELL ROBERTSON is the design firm of record for SSRH - CLINIC RENOVATION, according to its TDLR filing.
How much does SSRH - CLINIC RENOVATION cost and how big is it?
SSRH - CLINIC RENOVATION has an estimated construction value of $1.4M, based on its TDLR filing.
๐Scope of Work
The project consists of renovating approximately 9,000sfof the existing hospital to be a separate clinic.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Feb 26, 2016
Review Complete
Inspection Complete
Closed
Jul 1, 2016
๐Related Projects
๐คSame Owner
$115.7M total๐Related City Permits
Building permits found at or near this location
Express: Valleys are pitched incorrectly repairing the pitch and adding 200-250 sqft of decking not changing the underlying structure of removing decking
Replacement of complete existing central heat and air system with or without duct work Replacement of HVAC system without duct work for Unit K108
Finish out for Light Manufacturing. Scope does not overlap Phase 1 under 2026-028062 PR
temporary electric power and lighting cords for 4th of July event.
interior remodel - Home Remodel -Under house plumbing system replacement -new flooring for the house 1900 sqm -Wall and ceiling repair -replace 35x47 window with the same size and same location Kitchen Remodel -ceiling to be raised 12 -appliances and fixtures will be all same location -hood to run new dedicated wiring and new exhaust duct -new AFCI outlets per code -4 new recessed ceiling light 1 pendant light and 1 dimmer switch -new cabinetry countertop and tiles Master Bathroom Remodel -frame new shower pan and shampoo niche -fixtures all the same location -install 2 GFCI outlets -install 2 recessed light -new cabinets countertops and tiles Second Floor Bathroom Remodel -frame new shampoo niche -toilet to be relocated -other bathroom fixtures will stay -install 2 GFCI outlets -install 1 recessed light Office Renovatiom -install walls insulation and ceiling for the new office room -install one electrical outlet on each wall per code -install one ceiling fan/light combo -flooring installation -demolish existing wall section for new windows -Install 4 new AC supply grills and extend ductwork and connect to the main HVAC System and Airhandler Bathroom Addition -Remove existing wall separating the future bathroom space from the living area to create the new layout -Install a structural wood beam to support the load-bearing requirements of the removed wall. -Frame and install new walls as per plans -install wall tiles cabinets paint walls -Install fixtures as per plans Master Bedroom Remodel -Extend Master Bedroom Closet as per design layout -install 2 new outlets as per code -install 3 recessed LED Lights and wirings Laundry Remodel -remove existing door and create new access door to water heater tank -install new cabinets