Zabalist
ZabalistTexas Construction
๐Ÿ  Home
๐Ÿ“‹ Directory
๐Ÿ’Ž Pricing๐Ÿ“Š Data
Sign InCreate Account
Zabalist
ZabalistTexas Construction

The most comprehensive Texas construction intelligence platform. Search verified contractors, track permits, and explore projects across the state.

โœ“ Verified DataFree to Search

Directory

  • Contractors
  • Builders
  • Architects
  • Developers
  • Property Owners

Construction Data

  • Building Permits
  • State Projects
  • Site Plans
  • Texas RFPs & Bids
  • Browse by City
  • Browse by County

Free Tools

  • Contractor License Lookup
  • Permit Cost Estimator
  • Free Contractor Badges
  • About Zabalist
  • Contact Us

ยฉ 2026 Smart Austin LLC d/b/a Moon Sherpa Labs. All rights reserved.

TermsPrivacyCookiesDo Not SellAccessibilityDMCAData Sources
Data from verified public sources. Not affiliated with any government agency.
  1. Home
  2. /
  3. Projects
  4. /
  5. Travis
Construction complete ยท Feb 2017๐ŸProject Closed๐Ÿ”ง Renovation/Alteration๐Ÿ’ต This project is privately funded, on private land for private use.

BERGSTROM TECH CENTER LOBBY RENOVATIONS

6800 BURLESON ROAD, Austin, TX 78744, Austin, TX, 78744
Completed100%

๐Ÿ“ŠProject Metrics

TDLR #EABPRJB6820666
$250K
Project Value
โ€”
Square Feet
โ€”
Cost/SqFt
6 months
Duration
Registered:Jul 15, 2016
Start:Aug 1, 2016
Target:Feb 1, 2017
๐Ÿ

Project Closed

Project has been completed and closed

BERGSTROM TECH CENTER LOBBY RENOVATIONS is a Renovation/Alteration project located at 6800 BURLESON ROAD, Austin, TX 78744 in Austin, Texas. The project has an estimated value of $250K. CAPITAL COMMERCIAL INVESTMENTS INC is the property owner and GSC ARCHITECTS is the design firm of record. The project was registered with TDLR on July 15, 2016.

๐Ÿ“‹Scope of Work

Renovation of an existing building lobby, new conferencerooms and new monumental stair.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

๐Ÿ“…Compliance Timeline

Project Registered
July 15, 2016
Project Closed
February 1, 2017
Construction Start
August 1, 2016
Expected Completion
February 1, 2017

๐Ÿ“…Project Timeline

Filed

Jul 15, 2016

Review Complete

Inspection Complete

Closed

Feb 1, 2017

๐Ÿ“Location & Views

Open in MapsGet Directions|30.20203, -97.71021

๐Ÿ”—Related Projects

๐Ÿ‘คSame Owner

$59.1M total
CLEARVIEW SUITE 125 REMODEL
Dallasยท$50K

๐Ÿ›๏ธSame Design Firm

$5.5M total
1890 Ranch Building U
Cedar Parkยท$830K
1890 Ranch Building V
Cedar Parkยท$830K
TFC TSBVI
Austinยท$1.8M
AISD LEE ELEMENTARY CLASSROOM BUILDING
Austinยท$2.0M

๐Ÿ“Nearby Projects

Within 1 km
AUS02 - OFFICE RENOVATION
4100 SMITH SCHOOL RD, Austin, TX 78744ยท$3.0M
GRAVITRON
3501 DIME CIRCLE, Austin, TX 78744ยท$105K
OFFICE FURNITURE NOW
7103 BURLESON ROAD, Austin, TX 78744ยท$1.5M
TEXAS 2
4100 SMITH SCHOOL ROAD, Austin, TX 78744ยท$20.0M

๐Ÿ“„Related City Permits

Building permits found at or near this location

6800 EDINBURGH CV
7.56 mi away

Install a T-pole for home repairs Ref: 2026- 060030 BP

FinalElectrical PermitHomebuilder LoopMay 2026
View Details
2026-066612 EP
๐Ÿ”งBeltran Electric
6800 EDINBURGH CV
7.56 mi away

Express- House burned down minor express permit being requested. Received a letter from the code enforcement stating need to acquire necessary permits/inspections before it is considered habitable.

ActiveBuilding PermitRepairMay 2026
$1
View Details
2026-060030 BP
๐Ÿ”งRamsey Contracting
6800 VIA CORRETO DR
10.31 mi away

Replacement of complete existing central heat and air system with or without duct work LIKE FOR LIKE: 4 Ton Gas Horizontal System (Main) LIKE FOR LIKE: 2 Ton 2 Stage Gas Horizontal (Master/Bedrooms) **TWO SYSTEM CHANGE OUT**

ActiveMechanical PermitChange OutMay 2026
View Details
2026-062803 MP
๐Ÿ”งStan's Heating, Air, Plumbing, & Electrical
6800 GLEN RIDGE DR
11.18 mi away

Tunnel under foundation to replace cast iron for 3 full bathrooms kitchen and washer drain lines total length of tunnel is approximately 70 feet long. Two access holes will be made one in the front by the primary bathroom and the second on the right side of the home by the garage. Sewer line will also be replaced with a total length of 50 feet to reach the city tap connection.

FinalPlumbing PermitRepairApr 2026
View Details
2026-037648 PP
๐Ÿ”งCalixto Plumbing
6800 MESA DR
11.22 mi away

Tunnel under the home to expose all the existing cast iron drains. Replaced all with new pvc to the city tap.

ActivePlumbing PermitRepairMar 2026
View Details
2026-037636 PP
๐Ÿ”งGold Star Plumbing

๐Ÿ“Related Site Plans

City of Austin site plan approvals at this location

๐Ÿ“
MAINTENANCE STORAGE SHED
๐Ÿ“ 0.07 mi away
Approved and Released

Quick Actions

View on TDLRSatellite View
TDLR ID: EABPRJB6820666

Property Owner

๐Ÿ‘ค
CAPITAL COMMERCIAL INVESTMENTS
Contact: Registered by TDLR
73 projects ยท $59.1M
View company profile
ANDREW DOUGHTIE 800 BRAZOS ST. SUITE 600, AUSTIN, TX 78701
(512) 628-2785

Design Firm

๐Ÿ›๏ธ
GSC ARCHITECTS
4 projects ยท $5.5M
View all projects
TOM CORNELIUS 901 S. MOPAC BLDG III STE 400, AUSTIN, TX 78746
(512) 477-9417

Explore Area

๐Ÿ™๏ธ
Austin
View city projects
๐Ÿ—บ๏ธ
Travis County
View county projects
๐Ÿ“ฎ
ZIP 78744
View zip code projects

Find Professionals

๐Ÿ”จ
Contractors in Austin
Licensed contractors directory
๐Ÿ—๏ธ
Builders in Austin
Home & commercial builders
๐Ÿ“
Architects in Austin
Architecture & design firms

Get alerts for Travis

Daily email when new projects start nearby.

Start Alerts - $19/mo

Download project data

Get curated lists of projects with full contact info.

Browse Data Lists
Explore All Projects