SUITE C TENANT FINISH OUT
SUITE C TENANT FINISH OUT is a new construction project at 1205 SHELDON COVE, SUITE C Suite F, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Aug 2017). The project has an estimated value of $100K.
๐Project Metrics
TDLR #EABPRJB7817508Inspection Complete
Final inspection completed, awaiting project closure
SUITE C TENANT FINISH OUT is a New Construction project located at 1205 SHELDON COVE, SUITE C Suite F, Austin, TX 78753 in Austin, Texas. The project has an estimated value of $100K. METIS CAPITAL LLC is the property owner and MAGIC ARCHITECTURE is the design firm of record. The project was registered with TDLR on May 18, 2017.
โFrequently Asked Questions
What is SUITE C TENANT FINISH OUT?
SUITE C TENANT FINISH OUT is a new construction project at 1205 SHELDON COVE, SUITE C Suite F in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior tenant finish out within an existing building.2nd Floor accessible access is provided by shared build
Is SUITE C TENANT FINISH OUT open in Austin?
Construction on SUITE C TENANT FINISH OUT is complete โ TDLR records show the project passed its required accessibility inspection in Aug 2017. The building is finished and very likely open.
Where is SUITE C TENANT FINISH OUT located?
SUITE C TENANT FINISH OUT is located at 1205 SHELDON COVE, SUITE C Suite F, Austin, TX, 78753, in Travis County.
Who is the owner or developer of SUITE C TENANT FINISH OUT?
METIS CAPITAL LLC is the property owner/developer of record for SUITE C TENANT FINISH OUT, per its TDLR project registration.
Who is the architect or design firm for SUITE C TENANT FINISH OUT?
MAGIC ARCHITECTURE is the design firm of record for SUITE C TENANT FINISH OUT, according to its TDLR filing.
How much does SUITE C TENANT FINISH OUT cost and how big is it?
SUITE C TENANT FINISH OUT has an estimated construction value of $100K, based on its TDLR filing.
๐Scope of Work
Interior tenant finish out within an existing building.2nd Floor accessible access is provided by shared build
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
May 18, 2017
Review Complete
Inspection Complete
Aug 1, 2017
Closed
๐Related Projects
๐คSame Owner
$515K total๐๏ธSame Design Firm
$2.4M total๐Related City Permits
Building permits found at or near this location
Replacement of complete existing central heat and air system with or without duct work HVAC Change out only
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work **DEBRA LOPEZ: Replacing like for like 2t horz gas: No structural change.
Tesla proposing to add EV charging to existing parking. Includes the installation of 3 PSU which include 3 cabinets 24 charging posts 6 luminaires 1 Tesla site controller 1 switchboard assembly 1 utility transformer 1 meter 1 primary metering cabinet
Electrical Underground Primary and Secondary Service to Building. Installing 1 House Panel Tap Can and wire way in ETJ
Property Owner
Design Firm
Travis County Economy
Explore Area
Find Professionals
Need a contractor for this project?
Browse verified general contractors active in Travis County
Find General Contractors in Travis