Project intelligenceTDLR EABPRJB8812207Additions to Existing Building
Funding type

This project is privately funded, on private land for private use.

IGLESIA BAUTISTA MONTE SINAI ADDITION in Midland, TX

2105 S. BAIRD, Midland, TX, 79701

Construction complete · Dec 2021Project Closed

IGLESIA BAUTISTA MONTE SINAI ADDITION is a additions to existing building project at 2105 S. BAIRD, Midland, in Midland County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Dec 2021). The project has an estimated value of $222K across about 5,000 sq ft.

Estimated project value
$222K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
5,000 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$44/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
3y 8mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Mar 9, 20181,370 days across supplied datesDec 8, 2021

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    53 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    1,317 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 79701 (Midland)

One email per change. Unsubscribe in one click. Privacy.

IGLESIA BAUTISTA MONTE SINAI ADDITION is a Additions to Existing Building project located at 2105 S. BAIRD, Midland, TX 79701 in Midland, Texas. The project has an estimated value of $222K covering 5,000 sq ft. IGLESIA BAUTISTA MONTE SINAI is the property owner and DCI is the design firm of record. The project was registered with TDLR on March 9, 2018.

Frequently Asked Questions

What is IGLESIA BAUTISTA MONTE SINAI ADDITION?

IGLESIA BAUTISTA MONTE SINAI ADDITION is a additions to existing building project at 2105 S. BAIRD in Midland, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Addition of Fellowship Hall

Is IGLESIA BAUTISTA MONTE SINAI ADDITION open in Midland?

Construction on IGLESIA BAUTISTA MONTE SINAI ADDITION is complete — TDLR records show the project passed its required accessibility inspection in Dec 2021. The building is finished and very likely open.

Where is IGLESIA BAUTISTA MONTE SINAI ADDITION located?

IGLESIA BAUTISTA MONTE SINAI ADDITION is located at 2105 S. BAIRD, Midland, TX, 79701, in Midland County.

Who is the owner or developer of IGLESIA BAUTISTA MONTE SINAI ADDITION?

IGLESIA BAUTISTA MONTE SINAI is the property owner/developer of record for IGLESIA BAUTISTA MONTE SINAI ADDITION, per its TDLR project registration.

Who is the architect or design firm for IGLESIA BAUTISTA MONTE SINAI ADDITION?

DCI is the design firm of record for IGLESIA BAUTISTA MONTE SINAI ADDITION, according to its TDLR filing.

How much does IGLESIA BAUTISTA MONTE SINAI ADDITION cost and how big is it?

IGLESIA BAUTISTA MONTE SINAI ADDITION has an estimated construction value of $222K and approximately 5,000 square feet (about $44/sqft), based on its TDLR filing.

Scope of Work

Addition of Fellowship Hall

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

2105 S. BAIRD, Midland, TX, 79701

31.97836, -102.07020

Watch all construction in 79701 (Midland)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.