Project intelligenceTDLR TABS2020002019New Construction
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Replace Existing Bridge and Approaches WB Mainlanes in Amarillo, TX

At Arthur Street, Amarillo, TX, 79103

Construction complete · Oct 2019Project Closed

Replace Existing Bridge and Approaches WB Mainlanes is a new construction project at At Arthur Street, Amarillo, in Potter County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Oct 2019). The project has an estimated value of $46.7M across about 20,519 sq ft.

Estimated project value
$46.7M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
20,519 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$2.28K/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1y 4mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Jul 1, 2018487 days across supplied datesOct 31, 2019

4 timeline dates shown.

  1. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Source: TDLR filing

    View source record
  2. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    456 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    31 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 79103 (Amarillo)

One email per change. Unsubscribe in one click. Privacy.

Replace Existing Bridge and Approaches WB Mainlanes is a New Construction project located at At Arthur Street, Amarillo, TX 79103 in Amarillo, Texas. The project has an estimated value of $46.7M covering 20,519 sq ft. TxDOT District: Amarillo is the property owner and LJA Engineering is the design firm of record. The project was registered with TDLR on September 30, 2019.

Frequently Asked Questions

What is Replace Existing Bridge and Approaches WB Mainlanes?

Replace Existing Bridge and Approaches WB Mainlanes is a new construction project at At Arthur Street in Amarillo, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Replace Existing Bridge and Approaches WB Mainlanes.

Is Replace Existing Bridge and Approaches WB Mainlanes open in Amarillo?

Construction on Replace Existing Bridge and Approaches WB Mainlanes is complete — TDLR records show the project passed its required accessibility inspection in Oct 2019. The building is finished and very likely open.

Where is Replace Existing Bridge and Approaches WB Mainlanes located?

Replace Existing Bridge and Approaches WB Mainlanes is located at At Arthur Street, Amarillo, TX, 79103, in Potter County.

Who is the owner or developer of Replace Existing Bridge and Approaches WB Mainlanes?

TxDOT District: Amarillo is the property owner/developer of record for Replace Existing Bridge and Approaches WB Mainlanes, per its TDLR project registration.

Who is the architect or design firm for Replace Existing Bridge and Approaches WB Mainlanes?

LJA Engineering is the design firm of record for Replace Existing Bridge and Approaches WB Mainlanes, according to its TDLR filing.

How much does Replace Existing Bridge and Approaches WB Mainlanes cost and how big is it?

Replace Existing Bridge and Approaches WB Mainlanes has an estimated construction value of $46.7M and approximately 20,519 square feet (about $2.28K/sqft), based on its TDLR filing.

Scope of Work

Replace Existing Bridge and Approaches WB Mainlanes.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

At Arthur Street, Amarillo, TX, 79103

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 79103 (Amarillo)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Amarillo?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.