Project intelligenceTDLR TABS2020006889New Construction
Funding type

This project is privately funded, on private land for private use.

Homestead Estates, Unit 2 in Elgin, TX

.25 mi SW of County Line Rd & Golden Eagle Way, Elgin, TX, 78621

Construction complete · May 2021Project Closed

Homestead Estates, Unit 2 is a new construction project at .25 mi SW of County Line Rd & Golden Eagle Way, Elgin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed May 2021). The project has an estimated value of $5.7M across about 450,000 sq ft.

Estimated project value
$5.7M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
450,000 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$13/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
8 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Dec 6, 2019542 days across supplied datesMay 31, 2021

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    300 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    242 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 78621 (Elgin)

One email per change. Unsubscribe in one click. Privacy.

Homestead Estates, Unit 2 is a New Construction project located at .25 mi SW of County Line Rd & Golden Eagle Way, Elgin, TX 78621 in Elgin, Texas. The project has an estimated value of $5.7M covering 450,000 sq ft. LGI Homes - Texas LLC is the property owner and Pape Dawson is the design firm of record. The project was registered with TDLR on December 6, 2019.

Frequently Asked Questions

What is Homestead Estates, Unit 2?

Homestead Estates, Unit 2 is a new construction project at .25 mi SW of County Line Rd & Golden Eagle Way in Elgin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Construction of pedestrian ramps and sidewalks for one phase of a single family residential subdivison.

Is Homestead Estates, Unit 2 open in Elgin?

Construction on Homestead Estates, Unit 2 is complete — TDLR records show the project passed its required accessibility inspection in May 2021. The building is finished and very likely open.

Where is Homestead Estates, Unit 2 located?

Homestead Estates, Unit 2 is located at .25 mi SW of County Line Rd & Golden Eagle Way, Elgin, TX, 78621, in Travis County.

Who is the owner or developer of Homestead Estates, Unit 2?

LGI Homes - Texas LLC is the property owner/developer of record for Homestead Estates, Unit 2, per its TDLR project registration.

Who is the architect or design firm for Homestead Estates, Unit 2?

Pape Dawson is the design firm of record for Homestead Estates, Unit 2, according to its TDLR filing.

How much does Homestead Estates, Unit 2 cost and how big is it?

Homestead Estates, Unit 2 has an estimated construction value of $5.7M and approximately 450,000 square feet (about $13/sqft), based on its TDLR filing.

Scope of Work

Construction of pedestrian ramps and sidewalks for one phase of a single family residential subdivison.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

.25 mi SW of County Line Rd & Golden Eagle Way, Elgin, TX, 78621

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Related City Permits

Building permits found at or near this location

2530 SPRING LN

new screened porch to be 351 sf and over existing uncovered patio

ActivePlumbing PermitNewNov 2026
View Details
2026-074830 PP
Wildflower Plumbing & Gas LLC
2529 RIO GRANDE ST UNIT 13

Need a emergency permit to shut power off to this service to be able to replace the 100 amp main breaker

ActiveElectrical PermitRepairNov 2026
View Details
2026-144156 EP
Global Electric Services Inc
2505 W PARMER LN

Install one front lit channel letter sign

ActiveElectrical PermitWallNov 2026
View Details
2026-052018 EP
CND Signs, LLC
2500 S US 183 HWY SB UNIT 370

Bldg 3 Unit 370- NEW ABOVE-GROUND LP (PROPANE) GAS PIPING INSTALLATION COMMERCIAL ROASTING EQUIPMENT. This is a standalone new-work trade permit (gas piping) NOT a repair permit. No existing gas piping is being repaired replaced or altered; this is new piping to a newly installed appliance. PURPOSE: Install new above-ground LP gas piping to supply a commercial coffee roaster (IMF RM-15A_STD manufacturer data sheet Doc ST_00) inside the modular building at this address. Piping runs from the roasters gas train inlet connection to a new exterior termination stub at the rear exterior wall of the modular building. The exterior stub is a dead-end termination point only valved and capped for future connection by the propane supplier. Contractor scope ends at the exterior stub; it does NOT include the propane tank exterior regulators or any underground/trenched piping from the tank to the stub; that work is performed separately by the propane supply company. WORK DIMENSIONS: Total piping run approximately 25 to 35 feet (35 ft design basis) routed above ground through the rear interior of the modular building to an exterior wall penetration terminating at an exterior stub at the rear of the building. Pipe size: 3/4 in nominal Schedule 40 black steel trunk line reduced to 1/2 in NPT at the roasters gas train connection. Scope includes: pipe sizing and installation appliance shutoff valve at the roaster union sediment trap (drip leg) wall penetration with sleeve and seal exterior stub termination (valved and capped) pressure test and leak test of all new piping and coordination of required city inspections. No underground piping by the applicant. APPLIANCE DIMENSIONS AND SPECS (IMF RM-15A_STD data sheet): Overall dimensions 87.16 in L x 41.73 in W x 76.45 in H; weight 1433 lb (650 kg); burner Riello Gulliver BS1F LPG; maximum thermal input 178000 BTU/hr; LPG consumption 8.4 lb/hr; required inlet pressure minimum 12 in WC maximum 48 in WC; gas train connection 1/2 in; c

ActivePlumbing PermitRepairNov 2026
View Details
2026-132862 PP
Lalos Plumbing
2510 ELMONT DR UNIT 201

Replacement of complete existing central heat and air system with or without duct work

ActiveMechanical PermitChange OutOct 2026
View Details
2026-139492 MP
Texas Multifamily Solution, LLC

Watch all construction in 78621 (Elgin)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.