Funding type
This project involves public funds, public land, or is a Federally funded roadway project.
Fort Bend ISD Package 21 : Turf and Athletics – HIGHTOWER High School in Missouri City, TX
3333 Hurricane Ln, Missouri City, TX, 77459
Fort Bend ISD Package 21 : Turf and Athletics – HIGHTOWER High School is a renovation/alteration project at 3333 Hurricane Ln, Missouri City, in Fort Bend County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Oct 2021). The project has an estimated value of $1.6M across about 245,439 sq ft.
- Estimated project value
- $1.6M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 245,439 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $7/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 1y 8mo
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
75 days after the preceding date shown.
Source: TDLR filing
View source recordProject closed · TDLR filing
The project record was closed in TDLR.
608 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
Same day as the preceding date shown.
Source: TDLR filing
View source record
Project Closed
Project has been completed and closed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 77459 (Missouri City)
One email per change. Unsubscribe in one click. Privacy.
Fort Bend ISD Package 21 : Turf and Athletics – HIGHTOWER High School is a Renovation/Alteration project located at 3333 Hurricane Ln, Missouri City, TX 77459 in Missouri City, Texas. The project has an estimated value of $1.6M covering 245,439 sq ft. Fort Bend ISD is the property owner and VLK Architects Inc is the design firm of record. The project was registered with TDLR on December 17, 2019.
Frequently Asked Questions
What is Fort Bend ISD Package 21 : Turf and Athletics – HIGHTOWER High School?
Fort Bend ISD Package 21 : Turf and Athletics – HIGHTOWER High School is a renovation/alteration project at 3333 Hurricane Ln in Missouri City, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: • SYNTHETIC TURF SYSTEM • GOAL POSTS • SOCCER GOALS • REPLACE CHAIN LINK FENCE • REPLACE BASKETBALL GOALS & GOAL PADS • INSTALL AUTOMATIC BLEACHERS • REPLACE GOAL PADS •PA/SOUND SYSTEM
Is Fort Bend ISD Package 21 : Turf and Athletics – HIGHTOWER High School open in Missouri City?
Construction on Fort Bend ISD Package 21 : Turf and Athletics – HIGHTOWER High School is complete — TDLR records show the project passed its required accessibility inspection in Oct 2021. The building is finished and very likely open.
Where is Fort Bend ISD Package 21 : Turf and Athletics – HIGHTOWER High School located?
Fort Bend ISD Package 21 : Turf and Athletics – HIGHTOWER High School is located at 3333 Hurricane Ln, Missouri City, TX, 77459, in Fort Bend County.
Who is the owner or developer of Fort Bend ISD Package 21 : Turf and Athletics – HIGHTOWER High School?
Fort Bend ISD is the property owner/developer of record for Fort Bend ISD Package 21 : Turf and Athletics – HIGHTOWER High School, per its TDLR project registration.
Who is the architect or design firm for Fort Bend ISD Package 21 : Turf and Athletics – HIGHTOWER High School?
VLK Architects Inc is the design firm of record for Fort Bend ISD Package 21 : Turf and Athletics – HIGHTOWER High School, according to its TDLR filing.
How much does Fort Bend ISD Package 21 : Turf and Athletics – HIGHTOWER High School cost and how big is it?
Fort Bend ISD Package 21 : Turf and Athletics – HIGHTOWER High School has an estimated construction value of $1.6M and approximately 245,439 square feet (about $7/sqft), based on its TDLR filing.
Scope of Work
• SYNTHETIC TURF SYSTEM • GOAL POSTS • SOCCER GOALS • REPLACE CHAIN LINK FENCE • REPLACE BASKETBALL GOALS & GOAL PADS • INSTALL AUTOMATIC BLEACHERS • REPLACE GOAL PADS •PA/SOUND SYSTEM
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
3333 Hurricane Ln, Missouri City, TX, 77459
Explore the supplied address
A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.
Related Projects
Same Owner
$47.53B totalSame Design Firm
$9.55B totalWatch all construction in 77459 (Missouri City)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Missouri City?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.