Funding type
This project involves public funds, public land, or is a Federally funded roadway project.
SL Widening (Bob Hope to Zaragoza)
SL 375, El Paso, TX, 79907
SL Widening (Bob Hope to Zaragoza) is a new construction project at SL 375, El Paso, in El Paso County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Jan 2024 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $626K across about 38,000 sq ft.
- Estimated project value
- $626K
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 38,000 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $16/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 3y 9mo
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
Same day as the preceding date shown.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
56 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
1,340 days after the preceding date shown.
Source: TDLR filing
View source record
Review Complete
Design review complete, construction may proceed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 79907 (El Paso)
One email per change. Unsubscribe in one click. Privacy.
SL Widening (Bob Hope to Zaragoza) is a New Construction project located at SL 375, El Paso, TX 79907 in El Paso, Texas. The project has an estimated value of $626K covering 38,000 sq ft. TxDOT District: El Paso is the property owner and AECOM is the design firm of record. The project was registered with TDLR on March 6, 2020.
Frequently Asked Questions
What is SL Widening (Bob Hope to Zaragoza)?
SL Widening (Bob Hope to Zaragoza) is a new construction project at SL 375 in El Paso, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Widening from 4 to 6 lanes, and North Bound Frontage Road extension over Union Pacific Rail Road (UPRR). Work includes structures, retaining walls,pavement, drainage, sidewalks, ADA ramps, illumination, signing and pavement markings
Is SL Widening (Bob Hope to Zaragoza) open in El Paso?
SL Widening (Bob Hope to Zaragoza) was scheduled to finish construction in Jan 2024 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.
Where is SL Widening (Bob Hope to Zaragoza) located?
SL Widening (Bob Hope to Zaragoza) is located at SL 375, El Paso, TX, 79907, in El Paso County.
Who is the owner or developer of SL Widening (Bob Hope to Zaragoza)?
TxDOT District: El Paso is the property owner/developer of record for SL Widening (Bob Hope to Zaragoza), per its TDLR project registration.
Who is the architect or design firm for SL Widening (Bob Hope to Zaragoza)?
AECOM is the design firm of record for SL Widening (Bob Hope to Zaragoza), according to its TDLR filing.
How much does SL Widening (Bob Hope to Zaragoza) cost and how big is it?
SL Widening (Bob Hope to Zaragoza) has an estimated construction value of $626K and approximately 38,000 square feet (about $16/sqft), based on its TDLR filing.
Scope of Work
Widening from 4 to 6 lanes, and North Bound Frontage Road extension over Union Pacific Rail Road (UPRR). Work includes structures, retaining walls,pavement, drainage, sidewalks, ADA ramps, illumination, signing and pavement markings
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Related Projects
Same Owner
$37.03B totalWatch all construction in 79907 (El Paso)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.