This project involves public funds, public land, or is a Federally funded roadway project.
SH 114 in Southlake, TX
from FM 1938 to Dove Road, Southlake, TX, 76092
SH 114 is a new construction project at from FM 1938 to Dove Road, Southlake, in Tarrant County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Oct 2026). The project has an estimated value of $35.0M across about 97,200 sq ft.
- Estimated project value
- $35.0M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 97,200 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $360/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 3y 8mo
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
5 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
Same day as the preceding date shown.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
163 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
1,308 days after the preceding date shown.
Source: TDLR filing
View source recordInspection complete · TDLR filing
The filing records completion of the accessibility inspection.
889 days after the preceding date shown.
Source: TDLR filing
View source record
📰About SH 114
The construction of the SH 114 frontage road improvements in Southlake is complete. The project, registered with TDLR as Csj: 0353-03-100, passed its final TDLR accessibility inspection in October 2026. This infrastructure development spans the corridor from FM 1938 to Dove Road in the Sundance Square area of Tarrant County.
Project Scope and Scale
TxDOT District: Fort Worth owns this new construction project, which involves a total estimated cost of $34,998,486. The work covers 97,200 sq ft of roadway and infrastructure, resulting in a computed cost of $360 per sq ft. The scope includes the construction of new frontage roads, the reversal of existing ramps, and the addition of auxiliary lanes to existing frontage roads.
Key engineering components include the widening of a bridge and the addition of U-turn lanes at two specific intersections: Kirkwood/Solana Blvd. and the west side of Dove Rd. These improvements are designed to enhance traffic flow and safety in the busy Sundance Square district. The project was registered in April 2020, with plan review completed the same month and construction starting in October 2020.
Context and Comparisons
This project is significantly larger than typical new construction filings in Tarrant County. The estimated cost of $34,998,486 is above the county median of $800,000 for similar projects. The scheduled build window of 1308 days is longer than the county median of 214 days. Additionally, the cost per square foot of $360 is above the county median of $121.
Kimley-Horn and Associates, Inc. served as the design firm of record for this project. Frank Fonseca is the registered accessibility specialist associated with the filing. The project involves public funds and is a Federally funded roadway project. While the TDLR record confirms the completion of construction and accessibility compliance, it does not provide information on specific business operations or opening dates for adjacent commercial entities.
The surrounding area, ZIP code 76092, has a population of approximately 31,344 according to U.S. Census ACS 2023 estimates. The median household income in this area is $250,001. Nearby landmarks include Sundance Square, Bass Performance Hall, and several hotels such as The Worthington Renaissance Fort Worth Hotel. The completion of this roadway project marks the end of a multi-year construction phase for this section of SH 114.
Inspection Complete
Final inspection completed, awaiting project closure
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 76092 (Southlake)
One email per change. Unsubscribe in one click. Privacy.
SH 114 is a New Construction project located at from FM 1938 to Dove Road, Southlake, TX 76092 in Southlake, Texas. The project has an estimated value of $35.0M covering 97,200 sq ft. TxDOT District: Fort Worth is the property owner and Kimley-Horn and Associates, Inc. is the design firm of record. The project was registered with TDLR on April 21, 2020.
Frequently Asked Questions
Is the SH 114 project in Southlake finished?
Yes, the project passed its final TDLR accessibility inspection in October 2026. The TDLR status is listed as Inspection Complete, indicating that the construction phase is officially concluded.
Who is the owner of this roadway project?
The owner of record is TxDOT District: Fort Worth. The project was designed by Kimley-Horn and Associates, Inc., and involves public funds and federal funding.
What specific improvements were made to the road?
The work included new frontage roads, reversed ramps, auxiliary lanes, bridge widening, and U-turn lanes at Kirkwood/Solana Blvd. and the west side of Dove Rd.
How much did the project cost?
The estimated cost for the project was $34,998,486. This figure is significantly above the median cost for new construction projects in Tarrant County.
When did construction start and end?
Construction started in October 2020. The project passed its final TDLR accessibility inspection in October 2026, marking the completion of the work.
What is SH 114?
SH 114 is a new construction project at from FM 1938 to Dove Road in Southlake, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Construction of new frontage roads, reversal of existing ramps, addition of auxiliary lane to existing frontage road, widen of bridge and addition of U-turn lanes at Kirkwood/Solana Blvd. and west side of Dove Rd.
Is SH 114 open in Southlake?
Construction on SH 114 is complete — TDLR records show the project passed its required accessibility inspection in Oct 2026. The building is finished and very likely open.
Where is SH 114 located?
SH 114 is located at from FM 1938 to Dove Road, Southlake, TX, 76092, in Tarrant County.
Who is the owner or developer of SH 114?
TxDOT District: Fort Worth is the property owner/developer of record for SH 114, per its TDLR project registration.
Who is the architect or design firm for SH 114?
Kimley-Horn and Associates, Inc. is the design firm of record for SH 114, according to its TDLR filing.
How much does SH 114 cost and how big is it?
SH 114 has an estimated construction value of $35.0M and approximately 97,200 square feet (about $360/sqft), based on its TDLR filing.
Scope of Work
Construction of new frontage roads, reversal of existing ramps, addition of auxiliary lane to existing frontage road, widen of bridge and addition of U-turn lanes at Kirkwood/Solana Blvd. and west side of Dove Rd.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
from FM 1938 to Dove Road, Southlake, TX, 76092
Explore the supplied address
A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.
Related Projects
Same Owner
$31.88B totalWatch all construction in 76092 (Southlake)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Southlake?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.