Funding type
This project is privately funded, on private land for private use.
Las Colinas Corporate Center - Tower 1 & 2 Basement Corridors in Irving, TX
6333 State Highway 61 Towers 1 & 2, Irving, TX, 75038
Las Colinas Corporate Center - Tower 1 & 2 Basement Corridors is a renovation/alteration project at 6333 State Highway 61 Towers 1 & 2, Irving, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Oct 2020). The project has an estimated value of $299K across about 7,202 sq ft.
- Estimated project value
- $299K
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 7,202 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $42/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 5 months
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
8 days after the preceding date shown.
Source: TDLR filing
View source recordProject closed · TDLR filing
The project record was closed in TDLR.
153 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
Same day as the preceding date shown.
Source: TDLR filing
View source record
Project Closed
Project has been completed and closed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 75038 (Irving)
One email per change. Unsubscribe in one click. Privacy.
Las Colinas Corporate Center - Tower 1 & 2 Basement Corridors is a Renovation/Alteration project located at 6333 State Highway 61 Towers 1 & 2, Irving, TX 75038 in Irving, Texas. The project has an estimated value of $299K covering 7,202 sq ft. Peidmont Office Realty Trust is the property owner and ENTOS Design is the design firm of record. The project was registered with TDLR on May 14, 2020.
Frequently Asked Questions
What is Las Colinas Corporate Center - Tower 1 & 2 Basement Corridors?
Las Colinas Corporate Center - Tower 1 & 2 Basement Corridors is a renovation/alteration project at 6333 State Highway 61 Towers 1 & 2 in Irving, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Remodel of existing basement corridors
Is Las Colinas Corporate Center - Tower 1 & 2 Basement Corridors open in Irving?
Construction on Las Colinas Corporate Center - Tower 1 & 2 Basement Corridors is complete — TDLR records show the project passed its required accessibility inspection in Oct 2020. The building is finished and very likely open.
Where is Las Colinas Corporate Center - Tower 1 & 2 Basement Corridors located?
Las Colinas Corporate Center - Tower 1 & 2 Basement Corridors is located at 6333 State Highway 61 Towers 1 & 2, Irving, TX, 75038, in Dallas County.
Who is the owner or developer of Las Colinas Corporate Center - Tower 1 & 2 Basement Corridors?
Peidmont Office Realty Trust is the property owner/developer of record for Las Colinas Corporate Center - Tower 1 & 2 Basement Corridors, per its TDLR project registration.
Who is the architect or design firm for Las Colinas Corporate Center - Tower 1 & 2 Basement Corridors?
ENTOS Design is the design firm of record for Las Colinas Corporate Center - Tower 1 & 2 Basement Corridors, according to its TDLR filing.
How much does Las Colinas Corporate Center - Tower 1 & 2 Basement Corridors cost and how big is it?
Las Colinas Corporate Center - Tower 1 & 2 Basement Corridors has an estimated construction value of $299K and approximately 7,202 square feet (about $42/sqft), based on its TDLR filing.
Scope of Work
Remodel of existing basement corridors
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
6333 State Highway 61 Towers 1 & 2, Irving, TX, 75038
Explore the supplied address
A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.
Related Projects
Same Owner
$1.8M totalSame Design Firm
$5.28B totalWatch all construction in 75038 (Irving)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Irving?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.