Project intelligenceTDLR TABS2020019317New Construction
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

FM 2154 at Holleman Intersection Improvements in College Station, TX

FM 2154 at Holleman, College Station, TX, 77840

Construction complete · Nov 2022Project Closed

FM 2154 at Holleman Intersection Improvements is a new construction project at FM 2154 at Holleman, College Station, in Brazos County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Nov 2022). The project has an estimated value of $3.4M across about 14,748 sq ft.

Estimated project value
$3.4M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
14,748 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$231/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1y 10mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Jun 22, 2020862 days across supplied datesNov 1, 2022

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    193 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    669 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 77840 (College Station)

One email per change. Unsubscribe in one click. Privacy.

FM 2154 at Holleman Intersection Improvements is a New Construction project located at FM 2154 at Holleman, College Station, TX 77840 in College Station, Texas. The project has an estimated value of $3.4M covering 14,748 sq ft. TxDOT District: Bryan is the property owner and Binkley & Barfield, Inc. is the design firm of record. The project was registered with TDLR on June 22, 2020.

Frequently Asked Questions

What is FM 2154 at Holleman Intersection Improvements?

FM 2154 at Holleman Intersection Improvements is a new construction project at FM 2154 at Holleman in College Station, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Roadway reconstruction / intersection improvements, sidewalks, curb & gutter, and related pedestrian infrastructure.

Is FM 2154 at Holleman Intersection Improvements open in College Station?

Construction on FM 2154 at Holleman Intersection Improvements is complete — TDLR records show the project passed its required accessibility inspection in Nov 2022. The building is finished and very likely open.

Where is FM 2154 at Holleman Intersection Improvements located?

FM 2154 at Holleman Intersection Improvements is located at FM 2154 at Holleman, College Station, TX, 77840, in Brazos County.

Who is the owner or developer of FM 2154 at Holleman Intersection Improvements?

TxDOT District: Bryan is the property owner/developer of record for FM 2154 at Holleman Intersection Improvements, per its TDLR project registration.

Who is the architect or design firm for FM 2154 at Holleman Intersection Improvements?

Binkley & Barfield, Inc. is the design firm of record for FM 2154 at Holleman Intersection Improvements, according to its TDLR filing.

How much does FM 2154 at Holleman Intersection Improvements cost and how big is it?

FM 2154 at Holleman Intersection Improvements has an estimated construction value of $3.4M and approximately 14,748 square feet (about $231/sqft), based on its TDLR filing.

Scope of Work

Roadway reconstruction / intersection improvements, sidewalks, curb & gutter, and related pedestrian infrastructure.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

FM 2154 at Holleman, College Station, TX, 77840

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 77840 (College Station)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in College Station?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.