Project intelligenceTDLR TABS2021004429Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Gus Thomasson Road Reconstruction (US 80-Town East Blvd) in Mesquite, TX

Gus Thomasson Road Reconstruction(US 80-Town East), Mesquite, TX, 75150

Construction complete · Jan 2021Project Closed

Gus Thomasson Road Reconstruction (US 80-Town East Blvd) is a renovation/alteration project at Gus Thomasson Road Reconstruction(US 80-Town East), Mesquite, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jan 2021). The project has an estimated value of $923K across about 90,000 sq ft.

Estimated project value
$923K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
90,000 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$10/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
2 years
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Jan 7, 2019731 days across supplied datesJan 7, 2021

4 timeline dates shown.

  1. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Source: TDLR filing

    View source record
  2. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    679 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    52 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 75150 (Mesquite)

One email per change. Unsubscribe in one click. Privacy.

Gus Thomasson Road Reconstruction (US 80-Town East Blvd) is a Renovation/Alteration project located at Gus Thomasson Road Reconstruction(US 80-Town East), Mesquite, TX 75150 in Mesquite, Texas. The project has an estimated value of $923K covering 90,000 sq ft. City of Mesquite is the property owner and Binkley & Barfield, Inc. is the design firm of record. The project was registered with TDLR on November 16, 2020.

Frequently Asked Questions

What is Gus Thomasson Road Reconstruction (US 80-Town East Blvd)?

Gus Thomasson Road Reconstruction (US 80-Town East Blvd) is a renovation/alteration project at Gus Thomasson Road Reconstruction(US 80-Town East) in Mesquite, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: The RAS associated work is constructing a ne 12 ft concrete trail along the west side of Gus Thomasson Road, 5 ft concrete sidewalk, and installing ADA

Is Gus Thomasson Road Reconstruction (US 80-Town East Blvd) open in Mesquite?

Construction on Gus Thomasson Road Reconstruction (US 80-Town East Blvd) is complete — TDLR records show the project passed its required accessibility inspection in Jan 2021. The building is finished and very likely open.

Where is Gus Thomasson Road Reconstruction (US 80-Town East Blvd) located?

Gus Thomasson Road Reconstruction (US 80-Town East Blvd) is located at Gus Thomasson Road Reconstruction(US 80-Town East), Mesquite, TX, 75150, in Dallas County.

Who is the owner or developer of Gus Thomasson Road Reconstruction (US 80-Town East Blvd)?

City of Mesquite is the property owner/developer of record for Gus Thomasson Road Reconstruction (US 80-Town East Blvd), per its TDLR project registration.

Who is the architect or design firm for Gus Thomasson Road Reconstruction (US 80-Town East Blvd)?

Binkley & Barfield, Inc. is the design firm of record for Gus Thomasson Road Reconstruction (US 80-Town East Blvd), according to its TDLR filing.

How much does Gus Thomasson Road Reconstruction (US 80-Town East Blvd) cost and how big is it?

Gus Thomasson Road Reconstruction (US 80-Town East Blvd) has an estimated construction value of $923K and approximately 90,000 square feet (about $10/sqft), based on its TDLR filing.

Scope of Work

The RAS associated work is constructing a ne 12 ft concrete trail along the west side of Gus Thomasson Road, 5 ft concrete sidewalk, and installing ADA

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

Gus Thomasson Road Reconstruction(US 80-Town East), Mesquite, TX, 75150

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 75150 (Mesquite)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Mesquite?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.