Funding type
This project involves public funds, public land, or is a Federally funded roadway project.
Tornillo North and South Sidewalks/SUP
Los Coyotes Dr., Oil Mill Dr., Drake St., Linda Dr 2nd Street, Florinda Dr., Florella Dr., Cobb Ave, Tornillo, TX, 79853
Tornillo North and South Sidewalks/SUP is a new construction project at Los Coyotes Dr., Oil Mill Dr., Drake St., Linda Dr 2nd Street, Florinda Dr., Florella Dr., Cobb Ave, Tornillo, in El Paso County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Feb 2023). The project has an estimated value of $2.3M across about 81,150 sq ft.
- Estimated project value
- $2.3M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 81,150 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $28/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 11 months
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
421 days after the preceding date shown.
Source: TDLR filing
View source recordProject closed · TDLR filing
The project record was closed in TDLR.
333 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
Same day as the preceding date shown.
Source: TDLR filing
View source record
Project Closed
Project has been completed and closed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 79853 (Tornillo)
One email per change. Unsubscribe in one click. Privacy.
Tornillo North and South Sidewalks/SUP is a New Construction project located at Los Coyotes Dr., Oil Mill Dr., Drake St., Linda Dr 2nd Street, Florinda Dr., Florella Dr., Cobb Ave,, Tornillo, TX 79853 in Tornillo, Texas. The project has an estimated value of $2.3M covering 81,150 sq ft. El Paso County is the property owner and Moreno Cardenas Inc. is the design firm of record. The project was registered with TDLR on February 4, 2021.
Frequently Asked Questions
What is Tornillo North and South Sidewalks/SUP?
Tornillo North and South Sidewalks/SUP is a new construction project at Los Coyotes Dr., Oil Mill Dr., Drake St., Linda Dr 2nd Street, Florinda Dr., Florella Dr., Cobb Ave in Tornillo, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Consists in the construction of a 5-foot wide sidewalk along Drake Street, Old Mill Drive, and Los Coyotes Drive totaling 1.61 miles. It also consists in the construction of a 5-foot wide sidewalk along Cobb Avenue, Florinda Drive, Linda…
Is Tornillo North and South Sidewalks/SUP open in Tornillo?
Construction on Tornillo North and South Sidewalks/SUP is complete — TDLR records show the project passed its required accessibility inspection in Feb 2023. The building is finished and very likely open.
Where is Tornillo North and South Sidewalks/SUP located?
Tornillo North and South Sidewalks/SUP is located at Los Coyotes Dr., Oil Mill Dr., Drake St., Linda Dr 2nd Street, Florinda Dr., Florella Dr., Cobb Ave, Tornillo, TX, 79853, in El Paso County.
Who is the owner or developer of Tornillo North and South Sidewalks/SUP?
El Paso County is the property owner/developer of record for Tornillo North and South Sidewalks/SUP, per its TDLR project registration.
Who is the architect or design firm for Tornillo North and South Sidewalks/SUP?
Moreno Cardenas Inc. is the design firm of record for Tornillo North and South Sidewalks/SUP, according to its TDLR filing.
How much does Tornillo North and South Sidewalks/SUP cost and how big is it?
Tornillo North and South Sidewalks/SUP has an estimated construction value of $2.3M and approximately 81,150 square feet (about $28/sqft), based on its TDLR filing.
Scope of Work
Consists in the construction of a 5-foot wide sidewalk along Drake Street, Old Mill Drive, and Los Coyotes Drive totaling 1.61 miles. It also consists in the construction of a 5-foot wide sidewalk along Cobb Avenue, Florinda Drive, Linda Drive, Flore
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
Los Coyotes Dr., Oil Mill Dr., Drake St., Linda Dr 2nd Street, Florinda Dr., Florella Dr., Cobb Ave, Tornillo, TX, 79853
Explore the supplied address
A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.
Related Projects
Same Owner
$23.1M totalWatch all construction in 79853 (Tornillo)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Tornillo?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.