Methodist Hospital - 7th Floor Pedi HEMOC/BMT Renovation is a renovation/alteration project at 7700 Floyd Curl, San Antonio, in Bexar County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jul 2021). The project has an estimated value of $912K across about 2,318 sq ft.
Project has been completed and closed
Methodist Hospital - 7th Floor Pedi HEMOC/BMT Renovation is a Renovation/Alteration project located at 7700 Floyd Curl, San Antonio, TX 78229 in San Antonio, Texas. The project has an estimated value of $912K covering 2,318 sq ft. Kevin Richter is the property owner and Marmon Mok Architecture is the design firm of record. The project was registered with TDLR on February 26, 2021.
Methodist Hospital - 7th Floor Pedi HEMOC/BMT Renovation is a renovation/alteration project at 7700 Floyd Curl in San Antonio, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: This project consists of the renovation of an existing HEMOC suite on the 7th floor. This space, when complete, will include a HEMOC/BMT suite which will be contiguous with Methodist Hospital.
Construction on Methodist Hospital - 7th Floor Pedi HEMOC/BMT Renovation is complete โ TDLR records show the project passed its required accessibility inspection in Jul 2021. The building is finished and very likely open.
Methodist Hospital - 7th Floor Pedi HEMOC/BMT Renovation is located at 7700 Floyd Curl, San Antonio, TX, 78229, in Bexar County.
Kevin Richter is the property owner/developer of record for Methodist Hospital - 7th Floor Pedi HEMOC/BMT Renovation, per its TDLR project registration.
Marmon Mok Architecture is the design firm of record for Methodist Hospital - 7th Floor Pedi HEMOC/BMT Renovation, according to its TDLR filing.
Methodist Hospital - 7th Floor Pedi HEMOC/BMT Renovation has an estimated construction value of $912K and approximately 2,318 square feet (about $393/sqft), based on its TDLR filing.
This project consists of the renovation of an existing HEMOC suite on the 7th floor. This space, when complete, will include a HEMOC/BMT suite which will be contiguous with Methodist Hospital.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Feb 26, 2021
Review Complete
Inspection Complete
Closed
Jul 31, 2021