Buff City Soap
Buff City Soap is a renovation/alteration project at 5401 FM 1626 Suite 310, Kyle, in Hays County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Nov 2021). The project has an estimated value of $330K across about 2,870 sq ft.
๐Project Metrics
TDLR #TABS2021021621Inspection Complete
Final inspection completed, awaiting project closure
Buff City Soap is a Renovation/Alteration project located at 5401 FM 1626 Suite 310, Kyle, TX 78640 in Kyle, Texas. The project has an estimated value of $330K covering 2,870 sq ft. IVT Kyle Marketplace, LLC c/o InvenTrust Property Management, LLC is the property owner and Lokal Workshop LLC is the design firm of record. The project was registered with TDLR on August 9, 2021.
โFrequently Asked Questions
What is Buff City Soap?
Buff City Soap is a renovation/alteration project at 5401 FM 1626 Suite 310 in Kyle, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Remodel of existing tenant space. No exterior or site work included.
Is Buff City Soap open in Kyle?
Construction on Buff City Soap is complete โ TDLR records show the project passed its required accessibility inspection in Nov 2021. The building is finished and very likely open.
Where is Buff City Soap located?
Buff City Soap is located at 5401 FM 1626 Suite 310, Kyle, TX, 78640, in Hays County.
Who is the owner or developer of Buff City Soap?
IVT Kyle Marketplace, LLC c/o InvenTrust Property Management, LLC is the property owner/developer of record for Buff City Soap, per its TDLR project registration.
Who is the architect or design firm for Buff City Soap?
Lokal Workshop LLC is the design firm of record for Buff City Soap, according to its TDLR filing.
How much does Buff City Soap cost and how big is it?
Buff City Soap has an estimated construction value of $330K and approximately 2,870 square feet (about $115/sqft), based on its TDLR filing.
๐Scope of Work
Remodel of existing tenant space. No exterior or site work included.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Aug 9, 2021
Review Complete
Inspection Complete
Nov 15, 2021
Closed
๐Related Projects
๐๏ธSame Design Firm
$22.6M total๐Related City Permits
Building permits found at or near this location
New garage with apartment and a separate permit for pre-manufactured pool inside the building
Replace 40 of cast iron pipe in between floors Per PC: (7/15/26) ...Bathroom cast iron re-piping includes new toilet flange new vertical piping in wall to past sink drain connections of both upstairs and downstairs. (This will not exceed 128 sq ft drywall damage) new mainline drop to concrete new pee trap on upstairs shower but re-use of shower drain. Install single piece dual flush Toto toilet after inspection.
Addition/Interior Remodel - Approx 612 sqft Interior remodel to existing single family adding half bath converting existing garage into new master suite - adding 612 sqft new attached garage
Express: like-for-like window replacement siding repair
Addition/Interior Remodel - Approx 612 sqft Interior remodel to existing single family adding half bath converting existing garage into new master suite - adding 612 sqft new attached garage