Spectrum
Spectrum is a renovation/alteration project at 840 NE Mall Boulevard, Suite 840, Hurst, in Tarrant County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $200K across about 4,000 sq ft.
๐Project Metrics
TDLR #TABS2022005166Review Complete
Design review complete, construction may proceed
Spectrum is a Renovation/Alteration project located at 840 NE Mall Boulevard, Suite 840, Hurst, TX 76053 in Hurst, Texas. The project has an estimated value of $200K covering 4,000 sq ft. Washington Prime is the property owner and Ware Malcomb is the design firm of record. The project was registered with TDLR on November 12, 2021.
โFrequently Asked Questions
What is Spectrum?
Spectrum is a renovation/alteration project at 840 NE Mall Boulevard, Suite 840 in Hurst, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Renovate existing retail lase space.
Is Spectrum open in Hurst?
Spectrum is currently under construction in Hurst, TX. Its current TDLR status is "Review Complete".
Where is Spectrum located?
Spectrum is located at 840 NE Mall Boulevard, Suite 840, Hurst, TX, 76053, in Tarrant County.
Who is the owner or developer of Spectrum?
Washington Prime is the property owner/developer of record for Spectrum, per its TDLR project registration.
Who is the architect or design firm for Spectrum?
Ware Malcomb is the design firm of record for Spectrum, according to its TDLR filing.
How much does Spectrum cost and how big is it?
Spectrum has an estimated construction value of $200K and approximately 4,000 square feet (about $50/sqft), based on its TDLR filing.
๐Scope of Work
Renovate existing retail lase space.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Nov 12, 2021
Review Complete
Nov 12, 2021
Inspection Complete
Closed