Construction complete · Dec 2022Project Closed Renovation/Alteration This project is privately funded, on private land for private use.

Methodist Hospital 5th Floor Central Tower Cath Lab Expansion

7700 Floty Curl Drive, San Antonio, TX 78229, San Antonio, TX, 78229

Methodist Hospital 5th Floor Central Tower Cath Lab Expansion is a renovation/alteration project at 7700 Floty Curl Drive, San Antonio, in Bexar County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Dec 2022). The project has an estimated value of $3.1M across about 7,110 sq ft.

Completed100%

Project Metrics

TDLR #TABS2022005695
$3.1M
Project Value
7,110
Square Feet
$436/sqft
Cost/SqFt
1 year
Duration
Registered:Nov 19, 2021
Start:Dec 1, 2021
Target:Dec 1, 2022

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 78229 (San Antonio)

One email per change. Unsubscribe in one click. Privacy.

Methodist Hospital 5th Floor Central Tower Cath Lab Expansion is a Renovation/Alteration project located at 7700 Floty Curl Drive, San Antonio, TX 78229 in San Antonio, Texas. The project has an estimated value of $3.1M covering 7,110 sq ft. Methodist Healthcare System is the property owner and Marmon Mok Architecture is the design firm of record. The project was registered with TDLR on November 19, 2021.

Frequently Asked Questions

What is Methodist Hospital 5th Floor Central Tower Cath Lab Expansion?

Methodist Hospital 5th Floor Central Tower Cath Lab Expansion is a renovation/alteration project at 7700 Floty Curl Drive in San Antonio, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Scope includes Architecture/Interiors, MEP, & Structural design to renovate the existing 5th floor cath labs suite with associated support services for functionality and design and specifications for new furniture and new equipment coord…

Is Methodist Hospital 5th Floor Central Tower Cath Lab Expansion open in San Antonio?

Construction on Methodist Hospital 5th Floor Central Tower Cath Lab Expansion is complete — TDLR records show the project passed its required accessibility inspection in Dec 2022. The building is finished and very likely open.

Where is Methodist Hospital 5th Floor Central Tower Cath Lab Expansion located?

Methodist Hospital 5th Floor Central Tower Cath Lab Expansion is located at 7700 Floty Curl Drive, San Antonio, TX, 78229, in Bexar County.

Who is the owner or developer of Methodist Hospital 5th Floor Central Tower Cath Lab Expansion?

Methodist Healthcare System is the property owner/developer of record for Methodist Hospital 5th Floor Central Tower Cath Lab Expansion, per its TDLR project registration.

Who is the architect or design firm for Methodist Hospital 5th Floor Central Tower Cath Lab Expansion?

Marmon Mok Architecture is the design firm of record for Methodist Hospital 5th Floor Central Tower Cath Lab Expansion, according to its TDLR filing.

How much does Methodist Hospital 5th Floor Central Tower Cath Lab Expansion cost and how big is it?

Methodist Hospital 5th Floor Central Tower Cath Lab Expansion has an estimated construction value of $3.1M and approximately 7,110 square feet (about $436/sqft), based on its TDLR filing.

Scope of Work

Scope includes Architecture/Interiors, MEP, & Structural design to renovate the existing 5th floor cath labs suite with associated support services for functionality and design and specifications for new furniture and new equipment coordination.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Compliance Timeline

Project Registered
November 19, 2021
Project Closed
December 1, 2022
Construction Start
December 1, 2021
Expected Completion
December 1, 2022

Project Timeline

Filed

Nov 19, 2021

Review Complete

Inspection Complete

Closed

Dec 1, 2022

Quick Actions

TDLR ID: TABS2022005695

Design Firm

Marmon Mok Architects
132 projects · $1.90B
View company profile
1020 NE Loop 410 Suite 201, San Antonio, Texas 78209

Bexar County Economy

4.8%
Unemployment
$294K
Median Listing
6,333
Bldg Permits/yr
2.2M
Population
9,112
Active Listings
$73K
Median Income
Source: FRED · Updated Jun 2026
County projects →

Watch all construction in 78229 (San Antonio)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Get alerts for Bexar

Daily email when new projects start nearby.

Start Alerts - $19/mo

Download project data

Get curated lists of projects with full contact info.

Browse Data Lists