Project intelligenceTDLR TABS2022010966Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Phase 11 Street Reconstruction

Bartlett Dr, Miller Dr and Tucker St, The Colony, TX, 75056

Target date passed (Nov 2023)Review Complete

Phase 11 Street Reconstruction is a renovation/alteration project at Bartlett Dr, Miller Dr and Tucker St, The Colony, in Denton County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Nov 2023 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $219K across about 27,510 sq ft.

Estimated project value
$219K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
27,510 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$8/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1y 8mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Feb 4, 2022664 days across supplied datesNov 30, 2023

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    56 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    608 days after the preceding date shown.

    Source: TDLR filing

    View source record

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 75056 (The Colony)

One email per change. Unsubscribe in one click. Privacy.

Phase 11 Street Reconstruction is a Renovation/Alteration project located at Bartlett Dr, Miller Dr and Tucker St, The Colony, TX 75056 in The Colony, Texas. The project has an estimated value of $219K covering 27,510 sq ft. City of The Colony is the property owner and Halff Associates, Inc. is the design firm of record. The project was registered with TDLR on February 4, 2022.

Frequently Asked Questions

What is Phase 11 Street Reconstruction?

Phase 11 Street Reconstruction is a renovation/alteration project at Bartlett Dr, Miller Dr and Tucker St in The Colony, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Reconstruction of Bartlett Drive, Miller Drive, and Tucker Street including new pavement, sidewalk and ramps, alleys, drainage, and utilities.

Is Phase 11 Street Reconstruction open in The Colony?

Phase 11 Street Reconstruction was scheduled to finish construction in Nov 2023 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.

Where is Phase 11 Street Reconstruction located?

Phase 11 Street Reconstruction is located at Bartlett Dr, Miller Dr and Tucker St, The Colony, TX, 75056, in Denton County.

Who is the owner or developer of Phase 11 Street Reconstruction?

City of The Colony is the property owner/developer of record for Phase 11 Street Reconstruction, per its TDLR project registration.

Who is the architect or design firm for Phase 11 Street Reconstruction?

Halff Associates, Inc. is the design firm of record for Phase 11 Street Reconstruction, according to its TDLR filing.

How much does Phase 11 Street Reconstruction cost and how big is it?

Phase 11 Street Reconstruction has an estimated construction value of $219K and approximately 27,510 square feet (about $8/sqft), based on its TDLR filing.

Scope of Work

Reconstruction of Bartlett Drive, Miller Drive, and Tucker Street including new pavement, sidewalk and ramps, alleys, drainage, and utilities.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

Bartlett Dr, Miller Dr and Tucker St, The Colony, TX, 75056

Location by street address

Watch all construction in 75056 (The Colony)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in The Colony?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.