Funding type
This project involves public funds, public land, or is a Federally funded roadway project.
METRO 54 ROUTE BOOST CORRIDOR SEGMENT F (MAINER ST-PACKAGE III)
ALONG MAINER ST (FROM ARDMORE ST TO SCOTT ST) ALONG MAINER ST (FROM ARDMORE ST TO SCOTT ST), Houston, TX, 77054
METRO 54 ROUTE BOOST CORRIDOR SEGMENT F (MAINER ST-PACKAGE III) is a renovation/alteration project at ALONG MAINER ST (FROM ARDMORE ST TO SCOTT ST) ALONG MAINER ST (FROM ARDMORE ST TO SCOTT ST), Houston, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Jun 2023 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $300K across about 50,000 sq ft.
- Estimated project value
- $300K
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 50,000 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $6/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 1y 1mo
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
3 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
79 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
380 days after the preceding date shown.
Source: TDLR filing
View source record
Project Registered
Project has been registered with TDLR and is in pre-construction phase
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 77054 (Houston)
One email per change. Unsubscribe in one click. Privacy.
METRO 54 ROUTE BOOST CORRIDOR SEGMENT F (MAINER ST-PACKAGE III) is a Renovation/Alteration project located at ALONG MAINER ST (FROM ARDMORE ST TO SCOTT ST) ALONG MAINER ST (FROM ARDMORE ST TO SCOTT ST), Houston, TX 77054 in Houston, Texas. The project has an estimated value of $300K covering 50,000 sq ft. METRO is the property owner and GUNDA CORPORATION, LLC (AN ARDURRA COMPANY) is the design firm of record. The project was registered with TDLR on March 28, 2022.
Frequently Asked Questions
What is METRO 54 ROUTE BOOST CORRIDOR SEGMENT F (MAINER ST-PACKAGE III)?
METRO 54 ROUTE BOOST CORRIDOR SEGMENT F (MAINER ST-PACKAGE III) is a renovation/alteration project at ALONG MAINER ST (FROM ARDMORE ST TO SCOTT ST) ALONG MAINER ST (FROM ARDMORE ST TO SCOTT ST) in Houston, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Construction of Sidewalks, Ramps, Bus Shelters, Driveways and Pavement Repair Areas along the project limits
Is METRO 54 ROUTE BOOST CORRIDOR SEGMENT F (MAINER ST-PACKAGE III) open in Houston?
METRO 54 ROUTE BOOST CORRIDOR SEGMENT F (MAINER ST-PACKAGE III) was scheduled to finish construction in Jun 2023 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.
Where is METRO 54 ROUTE BOOST CORRIDOR SEGMENT F (MAINER ST-PACKAGE III) located?
METRO 54 ROUTE BOOST CORRIDOR SEGMENT F (MAINER ST-PACKAGE III) is located at ALONG MAINER ST (FROM ARDMORE ST TO SCOTT ST) ALONG MAINER ST (FROM ARDMORE ST TO SCOTT ST), Houston, TX, 77054, in Harris County.
Who is the owner or developer of METRO 54 ROUTE BOOST CORRIDOR SEGMENT F (MAINER ST-PACKAGE III)?
METRO is the property owner/developer of record for METRO 54 ROUTE BOOST CORRIDOR SEGMENT F (MAINER ST-PACKAGE III), per its TDLR project registration.
Who is the architect or design firm for METRO 54 ROUTE BOOST CORRIDOR SEGMENT F (MAINER ST-PACKAGE III)?
GUNDA CORPORATION, LLC (AN ARDURRA COMPANY) is the design firm of record for METRO 54 ROUTE BOOST CORRIDOR SEGMENT F (MAINER ST-PACKAGE III), according to its TDLR filing.
How much does METRO 54 ROUTE BOOST CORRIDOR SEGMENT F (MAINER ST-PACKAGE III) cost and how big is it?
METRO 54 ROUTE BOOST CORRIDOR SEGMENT F (MAINER ST-PACKAGE III) has an estimated construction value of $300K and approximately 50,000 square feet (about $6/sqft), based on its TDLR filing.
Scope of Work
Construction of Sidewalks, Ramps, Bus Shelters, Driveways and Pavement Repair Areas along the project limits
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
ALONG MAINER ST (FROM ARDMORE ST TO SCOTT ST) ALONG MAINER ST (FROM ARDMORE ST TO SCOTT ST), Houston, TX, 77054
Related Projects
Same Owner
$70.6M totalWatch all construction in 77054 (Houston)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Houston?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.