2021 Capa-Up – Chem and Spec Gas
2021 Capa-Up – Chem and Spec Gas is a renovation/alteration project at 12100 Samsung Blvd., Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jun 2022). The project has an estimated value of $425K across about 200 sq ft.
Project Metrics
TDLR #TABS2022015333Project Closed
Project has been completed and closed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 78754 (Austin)
One email per change. Unsubscribe in one click. Privacy.
2021 Capa-Up – Chem and Spec Gas is a Renovation/Alteration project located at 12100 Samsung Blvd., Austin, TX 78754 in Austin, Texas. The project has an estimated value of $425K covering 200 sq ft. Samsung is the property owner and Fuse Architecture Studio is the design firm of record. The project was registered with TDLR on March 30, 2022.
Frequently Asked Questions
What is 2021 Capa-Up – Chem and Spec Gas?
2021 Capa-Up – Chem and Spec Gas is a renovation/alteration project at 12100 Samsung Blvd. in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Design for the installation of (11) pieces of chemical and spec. gas equipment related to processes
Is 2021 Capa-Up – Chem and Spec Gas open in Austin?
Construction on 2021 Capa-Up – Chem and Spec Gas is complete — TDLR records show the project passed its required accessibility inspection in Jun 2022. The building is finished and very likely open.
Where is 2021 Capa-Up – Chem and Spec Gas located?
2021 Capa-Up – Chem and Spec Gas is located at 12100 Samsung Blvd., Austin, TX, 78754, in Travis County.
Who is the owner or developer of 2021 Capa-Up – Chem and Spec Gas?
Samsung is the property owner/developer of record for 2021 Capa-Up – Chem and Spec Gas, per its TDLR project registration.
Who is the architect or design firm for 2021 Capa-Up – Chem and Spec Gas?
Fuse Architecture Studio is the design firm of record for 2021 Capa-Up – Chem and Spec Gas, according to its TDLR filing.
How much does 2021 Capa-Up – Chem and Spec Gas cost and how big is it?
2021 Capa-Up – Chem and Spec Gas has an estimated construction value of $425K and approximately 200 square feet (about $2.13K/sqft), based on its TDLR filing.
Scope of Work
Design for the installation of (11) pieces of chemical and spec. gas equipment related to processes
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Compliance Timeline
Project Timeline
Filed
Mar 30, 2022
Review Complete
Inspection Complete
Closed
Jun 1, 2022
Related Projects
Same Owner
$84.7M totalRelated City Permits
Building permits found at or near this location
Replacement of complete existing central heat and air system with or without duct work HVAC change out is in the hallway of the 4th floor of the main office building. No unit number.
NEW RESIDENTIAL IRRIGATION SYSTEM
Installing a new irrigation system
1360BR NEW 3 BEDROOM 2 BATH SINGLE FAMILY RESIDENTIAL HOME WITH ATTACHED GARAGE COVERED FRONT PORCH AND REAR PATIO
Home builders loop Ref: 2026-063452 EP ETJ
Property Owner
Design Firm
Registered Accessibility Specialist
Travis County Economy
Explore Area
Watch all construction in 78754 (Austin)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.