METRO BOOST Bus Stops and Sidewak Improvements-Segment 3
METRO BOOST Bus Stops and Sidewak Improvements-Segment 3 is a renovation/alteration project at Airline Dr (Tidwell Rd to Gulf Bank Rd), Houston, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Dec 2025). The project has an estimated value of $2.7M across about 110,000 sq ft.
๐Project Metrics
TDLR #TABS2022015956Project Closed
Project has been completed and closed
METRO BOOST Bus Stops and Sidewak Improvements-Segment 3 is a Renovation/Alteration project located at Airline Dr (Tidwell Rd to Gulf Bank Rd), Houston, TX 77026 in Houston, Texas. The project has an estimated value of $2.7M covering 110,000 sq ft. METRO is the property owner and Midtown Engineers, LLC is the design firm of record. The project was registered with TDLR on April 6, 2022.
โFrequently Asked Questions
What is METRO BOOST Bus Stops and Sidewak Improvements-Segment 3?
METRO BOOST Bus Stops and Sidewak Improvements-Segment 3 is a renovation/alteration project at Airline Dr (Tidwell Rd to Gulf Bank Rd) in Houston, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Construction of sidewalk, Pedestrian ramps, pavement replace, repair & installation. Signing & Pavement markings & traffic control devices. Pedestrian refuges & Median Islands. BOOST Bus stops, Shared Use Path Elements & Electrical Srvceโฆ
Is METRO BOOST Bus Stops and Sidewak Improvements-Segment 3 open in Houston?
Construction on METRO BOOST Bus Stops and Sidewak Improvements-Segment 3 is complete โ TDLR records show the project passed its required accessibility inspection in Dec 2025. The building is finished and very likely open.
Where is METRO BOOST Bus Stops and Sidewak Improvements-Segment 3 located?
METRO BOOST Bus Stops and Sidewak Improvements-Segment 3 is located at Airline Dr (Tidwell Rd to Gulf Bank Rd), Houston, TX, 77026, in Harris County.
Who is the owner or developer of METRO BOOST Bus Stops and Sidewak Improvements-Segment 3?
METRO is the property owner/developer of record for METRO BOOST Bus Stops and Sidewak Improvements-Segment 3, per its TDLR project registration.
Who is the architect or design firm for METRO BOOST Bus Stops and Sidewak Improvements-Segment 3?
Midtown Engineers, LLC is the design firm of record for METRO BOOST Bus Stops and Sidewak Improvements-Segment 3, according to its TDLR filing.
How much does METRO BOOST Bus Stops and Sidewak Improvements-Segment 3 cost and how big is it?
METRO BOOST Bus Stops and Sidewak Improvements-Segment 3 has an estimated construction value of $2.7M and approximately 110,000 square feet (about $25/sqft), based on its TDLR filing.
๐Scope of Work
Construction of sidewalk, Pedestrian ramps, pavement replace, repair & installation. Signing & Pavement markings & traffic control devices. Pedestrian refuges & Median Islands. BOOST Bus stops, Shared Use Path Elements & Electrical Srvce Connections
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Apr 6, 2022
Review Complete
Inspection Complete
Closed
Dec 31, 2025