2022 Street Preservation, Phase 3 in Waco, TX

3000 Austin Avenue, Waco, TX, 76701

Construction complete · Dec 2024Project Closed

2022 Street Preservation, Phase 3 is a renovation/alteration project at 3000 Austin Avenue, Waco, in McLennan County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Dec 2024). The project has an estimated value of $2.5M across about 9,000 sq ft.

Estimated project value
$2.5M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
9,000 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$281/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
2y 5mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Jun 2, 2022927 days across supplied datesDec 15, 2024

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    67 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    860 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 76701 (Waco)

One email per change. Unsubscribe in one click. Privacy.

2022 Street Preservation, Phase 3 is a Renovation/Alteration project located at 3000 Austin Avenue, Waco, TX 76701 in Waco, Texas. The project has an estimated value of $2.5M covering 9,000 sq ft. City of Waco is the property owner. The project was registered with TDLR on June 2, 2022.

Frequently Asked Questions

What is 2022 Street Preservation, Phase 3?

2022 Street Preservation, Phase 3 is a renovation/alteration project at 3000 Austin Avenue in Waco, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Removal of asphalt, concrete, signage and landscaping, Installation of new sidewalks, ramps, gutters and curbs

Is 2022 Street Preservation, Phase 3 open in Waco?

Construction on 2022 Street Preservation, Phase 3 is complete — TDLR records show the project passed its required accessibility inspection in Dec 2024. The building is finished and very likely open.

Where is 2022 Street Preservation, Phase 3 located?

2022 Street Preservation, Phase 3 is located at 3000 Austin Avenue, Waco, TX, 76701, in McLennan County.

Who is the owner or developer of 2022 Street Preservation, Phase 3?

City of Waco is the property owner/developer of record for 2022 Street Preservation, Phase 3, per its TDLR project registration.

How much does 2022 Street Preservation, Phase 3 cost and how big is it?

2022 Street Preservation, Phase 3 has an estimated construction value of $2.5M and approximately 9,000 square feet (about $281/sqft), based on its TDLR filing.

Scope of Work

Removal of asphalt, concrete, signage and landscaping, Installation of new sidewalks, ramps, gutters and curbs

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

3000 Austin Avenue, Waco, TX, 76701

31.53640, -97.15491

Watch all construction in 76701 (Waco)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.