Project has been completed and closed
Metro Boost Bus Stops & Sidewalk Improvements-Segment 1 is a Renovation/Alteration project located at Pressler St,Main St,Montrose Blvd,Studemont St, Studewood St & Voight St, Houston, TX 77005 in Houston, Texas. The project has an estimated value of $3.6M covering 115,000 sq ft. METRO is the property owner and Midtown Engineers, LLC is the design firm of record. The project was registered with TDLR on June 3, 2022.
Construction of sidewalk & pedestrian ramps, pavement replacement, pavement repair & installation. Signing & Pavement Markings & Traffic control devices, pedestrian refuges & median islands, BOOST bus stops, shared use path elements & electrical serv
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Jun 3, 2022
Review Complete
Inspection Complete
May 1, 2024
Closed
Jan 16, 2026