Metro Boost Bus Stops & Sidewalk Improvements-Segment 1
Metro Boost Bus Stops & Sidewalk Improvements-Segment 1 is a renovation/alteration project at Pressler St,Main St,Montrose Blvd,Studemont St, Studewood St & Voight St, Houston, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jan 2026). The project has an estimated value of $3.6M across about 115,000 sq ft.
๐Project Metrics
TDLR #TABS2022020607Project Closed
Project has been completed and closed
Metro Boost Bus Stops & Sidewalk Improvements-Segment 1 is a Renovation/Alteration project located at Pressler St,Main St,Montrose Blvd,Studemont St, Studewood St & Voight St, Houston, TX 77005 in Houston, Texas. The project has an estimated value of $3.6M covering 115,000 sq ft. METRO is the property owner and Midtown Engineers, LLC is the design firm of record. The project was registered with TDLR on June 3, 2022.
โFrequently Asked Questions
What is Metro Boost Bus Stops & Sidewalk Improvements-Segment 1?
Metro Boost Bus Stops & Sidewalk Improvements-Segment 1 is a renovation/alteration project at Pressler St,Main St,Montrose Blvd,Studemont St, Studewood St & Voight St in Houston, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Construction of sidewalk & pedestrian ramps, pavement replacement, pavement repair & installation. Signing & Pavement Markings & Traffic control devices, pedestrian refuges & median islands, BOOST bus stops, shared use path elements & elโฆ
Is Metro Boost Bus Stops & Sidewalk Improvements-Segment 1 open in Houston?
Construction on Metro Boost Bus Stops & Sidewalk Improvements-Segment 1 is complete โ TDLR records show the project passed its required accessibility inspection in Jan 2026. The building is finished and very likely open.
Where is Metro Boost Bus Stops & Sidewalk Improvements-Segment 1 located?
Metro Boost Bus Stops & Sidewalk Improvements-Segment 1 is located at Pressler St,Main St,Montrose Blvd,Studemont St, Studewood St & Voight St, Houston, TX, 77005, in Harris County.
Who is the owner or developer of Metro Boost Bus Stops & Sidewalk Improvements-Segment 1?
METRO is the property owner/developer of record for Metro Boost Bus Stops & Sidewalk Improvements-Segment 1, per its TDLR project registration.
Who is the architect or design firm for Metro Boost Bus Stops & Sidewalk Improvements-Segment 1?
Midtown Engineers, LLC is the design firm of record for Metro Boost Bus Stops & Sidewalk Improvements-Segment 1, according to its TDLR filing.
How much does Metro Boost Bus Stops & Sidewalk Improvements-Segment 1 cost and how big is it?
Metro Boost Bus Stops & Sidewalk Improvements-Segment 1 has an estimated construction value of $3.6M and approximately 115,000 square feet (about $31/sqft), based on its TDLR filing.
๐Scope of Work
Construction of sidewalk & pedestrian ramps, pavement replacement, pavement repair & installation. Signing & Pavement Markings & Traffic control devices, pedestrian refuges & median islands, BOOST bus stops, shared use path elements & electrical serv
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jun 3, 2022
Review Complete
Inspection Complete
May 1, 2024
Closed
Jan 16, 2026