Project intelligenceTDLR TABS2022022100Additions to Existing Building
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Simon Middle School Improvements in Kyle, TX

3839 FM150 E, Kyle, TX, 78640

Construction complete · Aug 2023Project Closed

Simon Middle School Improvements is a additions to existing building project at 3839 FM150 E, Kyle, in Hays County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Aug 2023). The project has an estimated value of $3.1M across about 5,700 sq ft.

Estimated project value
$3.1M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
5,700 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$549/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
8 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Jun 22, 2022415 days across supplied datesAug 11, 2023

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    173 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    242 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

📰About Simon Middle School Improvements

Simon Middle School Improvements added 5,700 square feet of Performing and Fine Arts space to the existing campus at 3839 FM150 E in Kyle, Texas. The project, registered with TDLR in June 2022, focused on a rehearsal and dance addition for Hays CISD. The estimated cost for this construction was $3,132,091. O'Connell Robertson served as the design firm of record for the project.

The construction window began in December 2022 and was scheduled for completion by August 2023. This timeline represents a 242-day build period, which is close to the county median of 213 days for similar additions. The project involved public funds and public land, subject to standard accessibility reviews under the TABS program.

Project Scale and Cost

At $549 per square foot, the cost per unit area was above the county median of $152 for comparable additions in Hays County. The total estimated cost of $3,132,091 places this project in the top quarter of similar filings in the region. This scale reflects the specialized requirements of a performing arts facility, including specific acoustic and spatial needs for dance and rehearsal.

Hays CISD is the owner of record, a district with significant recent construction activity. The district has six other TDLR-registered projects totaling over $485 million, including new high schools and renovations in Buda and Kyle. O'Connell Robertson, the design firm, has also worked on other educational and commercial projects across Texas, including facilities in Austin and Wimberley.

This geographic factor simplifies certain construction considerations related to water management. TDLR closed the project file in August 2023, which marks the end of the accessibility review process for this construction. The registration status confirms the project has completed its required state oversight steps.

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 78640 (Kyle)

One email per change. Unsubscribe in one click. Privacy.

Simon Middle School Improvements is a Additions to Existing Building project located at 3839 FM150 E, Kyle, TX 78640 in Kyle, Texas. The project has an estimated value of $3.1M covering 5,700 sq ft. Hays CISD is the property owner and O'Connell Robertson is the design firm of record. The project was registered with TDLR on June 22, 2022.

Frequently Asked Questions

What specific spaces were added to Simon Middle School?

The project added a Performing and Fine Arts section specifically designed for rehearsal and dance activities. This 5,700-square-foot addition expands the existing building's capacity for arts education.

Who designed the Simon Middle School Improvements project?

O'Connell Robertson is listed as the design firm of record. They are responsible for the architectural plans and specifications for this addition to the school campus.

Is the Simon Middle School addition complete?

TDLR closed the project file in August 2023, indicating the accessibility review process is finished. The scheduled completion date was also August 2023.

How much did the Simon Middle School project cost?

The estimated cost was $3,132,091. This figure is above the median cost for similar additions in Hays County, reflecting the specialized nature of the arts facility.

Is Simon Middle School open for operations?

The TDLR record confirms the construction and accessibility review are complete. It does not provide information on current school operations or opening dates for the new spaces.

What is Simon Middle School Improvements?

Simon Middle School Improvements is a additions to existing building project at 3839 FM150 E in Kyle, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Performing and Fine Arts Addition – Rehearsal, Dance

Is Simon Middle School Improvements open in Kyle?

Construction on Simon Middle School Improvements is complete — TDLR records show the project passed its required accessibility inspection in Aug 2023. The building is finished and very likely open.

Where is Simon Middle School Improvements located?

Simon Middle School Improvements is located at 3839 FM150 E, Kyle, TX, 78640, in Hays County.

Who is the owner or developer of Simon Middle School Improvements?

Hays CISD is the property owner/developer of record for Simon Middle School Improvements, per its TDLR project registration.

Who is the architect or design firm for Simon Middle School Improvements?

O'Connell Robertson is the design firm of record for Simon Middle School Improvements, according to its TDLR filing.

How much does Simon Middle School Improvements cost and how big is it?

Simon Middle School Improvements has an estimated construction value of $3.1M and approximately 5,700 square feet (about $549/sqft), based on its TDLR filing.

Scope of Work

Performing and Fine Arts Addition – Rehearsal, Dance

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

3839 FM150 E, Kyle, TX, 78640

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Related City Permits

Building permits found at or near this location

3839 STECK AVE

Replacement of complete existing central heat and air system with or without duct work

FinalMechanical PermitChange OutDec 2025
View Details
2025-157016 MP
Schlueter Air Conditioning & Refrigeration, LLC
3839 DRY CREEK DR BLDG D UNIT 217

Replacement of complete existing central heat and air system with or without duct work

FinalMechanical PermitChange OutOct 2025
View Details
2025-129510 MP
Radiant Plumbing and Air Conditioning
3839 DRY CREEK DR BLDG E UNIT 223

Replacement of complete existing central heat and air system with or without duct work UNT 223 BLD E DRY CREEK WEST CONDOMINIUMS

FinalMechanical PermitChange OutDec 2024
View Details
2024-156877 MP
American Residential Services (ARS)
3839 DRY CREEK DR BLDG E UNIT 226

Replacement of an existing water heater

FinalPlumbing PermitChange OutOct 2024
View Details
2024-131219 PP
3839 DRY CREEK DR BLDG E UNIT 226

Replacement of complete existing central heat and air system with or without duct work

ExpiredMechanical PermitChange OutJul 2024
View Details
2024-089708 MP
Champion AC of Austin LLC

Watch all construction in 78640 (Kyle)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.