KidStrong
KidStrong is a renovation/alteration project at 5250 S. State Highway 78 Suite 300, Sachse, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $250K across about 4,300 sq ft.
๐Project Metrics
TDLR #TABS2022024773Review Complete
Design review complete, construction may proceed
KidStrong is a Renovation/Alteration project located at 5250 S. State Highway 78 Suite 300, Sachse, TX 75048 in Sachse, Texas. The project has an estimated value of $250K covering 4,300 sq ft. Ten Forty-Five Real Estate is the property owner and Lokal Workshop LLC is the design firm of record. The project was registered with TDLR on July 27, 2022.
โFrequently Asked Questions
What is KidStrong?
KidStrong is a renovation/alteration project at 5250 S. State Highway 78 Suite 300 in Sachse, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Remodel of existing tenant space. No exterior or site work included.
Is KidStrong open in Sachse?
KidStrong is currently under construction in Sachse, TX. Its current TDLR status is "Review Complete".
Where is KidStrong located?
KidStrong is located at 5250 S. State Highway 78 Suite 300, Sachse, TX, 75048, in Dallas County.
Who is the owner or developer of KidStrong?
Ten Forty-Five Real Estate is the property owner/developer of record for KidStrong, per its TDLR project registration.
Who is the architect or design firm for KidStrong?
Lokal Workshop LLC is the design firm of record for KidStrong, according to its TDLR filing.
How much does KidStrong cost and how big is it?
KidStrong has an estimated construction value of $250K and approximately 4,300 square feet (about $58/sqft), based on its TDLR filing.
๐Scope of Work
Remodel of existing tenant space. No exterior or site work included.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jul 27, 2022
Review Complete
Jul 27, 2022
Inspection Complete
Closed