Fluence Office Finish Out in Austin, TX
4129 Commercial Center Drive Bldg. 4 Suite 400, Austin, TX, 78744
Fluence Office Finish Out is a renovation/alteration project at 4129 Commercial Center Drive Bldg. 4 Suite 400, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Apr 2023). The project has an estimated value of $72K across about 4,800 sq ft.
- Estimated project value
- $72K
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 4,800 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $15/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 6 months
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
36 days after the preceding date shown.
Source: TDLR filing
View source recordProject closed · TDLR filing
The project record was closed in TDLR.
180 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
Same day as the preceding date shown.
Source: TDLR filing
View source record
📰About Fluence Office Finish Out
Fluence Office Finish Out is a completed interior renovation at Southpark Corporate Center in Austin, Texas. The project involved the remodel of 4,800 square feet of existing office space located at 4129 Commercial Center Drive Bldg. 4 Suite 400. Stream Realty served as the owner of record, while KDS de stijl interiors LLC acted as the design firm. The estimated cost for this renovation was $72,000, equating to $15 per square foot. TDLR closed the project file in April 2023, which marks the end of the accessibility review process for this construction.
The work was registered with TDLR in September 2022, with construction starting in November 2022. The scheduled completion date was April 2023. David C Deming was the registered accessibility specialist for the filing. This project is privately funded and located on private land for private use.
Project Context
This renovation is smaller and less expensive than typical projects in the region. Among 14,971 TDLR-registered renovation filings in Travis County, the median cost is $297,000 and the median size is 3,800 square feet. This project’s cost is below the county median for its type, placing it in the bottom quarter. The scheduled build window of 180 days is longer than the county median of 98 days. The $15 per square foot cost is significantly below the county median of $103 per square foot.
Stream Realty has six other TDLR-registered projects totaling $2,660,000. These include The Quad in Dallas and Plummer St Facility in Houston. KDS de stijl interiors LLC has six other TDLR-registered projects totaling $13,456,601, including Corridor Park 9 in Austin and Georgetown Logistics Park in Georgetown. Other registered projects in the same area include Century South S.C. and Austin South Park Hotel, both of which are renovation or alteration projects.
Businesses near this site include McDonald's, Kenny's Collectibles of Austin LLC, Fit and Fearless, PPG Paint Store, JP3 Measurement, and Pretreatment/Cross Connection. According to U.S. Census ACS 2023 estimates for ZIP 78744, the population is about 51,069, with a median household income of $78,474. The median owner-occupied home value is $307,000. City of Austin permit records show one building permit on file at this street address, issued in 2025, with a final status. The permit involved the replacement of an existing roof system to meet energy code compliance.
Project Closed
Project has been completed and closed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 78744 (Austin)
One email per change. Unsubscribe in one click. Privacy.
Fluence Office Finish Out is a Renovation/Alteration project located at 4129 Commercial Center Drive Bldg. 4 Suite 400, Austin, TX 78744 in Austin, Texas. The project has an estimated value of $72K covering 4,800 sq ft. Stream Realty is the property owner and KDS de stijl interiors LLC is the design firm of record. The project was registered with TDLR on September 26, 2022.
Frequently Asked Questions
Is the Fluence Office Finish Out project complete?
Yes, TDLR closed the project file in April 2023. This indicates the accessibility review process for this construction is finished, though it does not confirm the business is open to the public.
Who owns the Fluence Office Finish Out project?
Stream Realty is the owner or developer of record for this project. The facility is named Southpark Corporate Center in the TDLR filing.
How much did the renovation cost?
The estimated cost for the 4,800-square-foot interior remodel was $72,000. This works out to $15 per square foot, which is below the Travis County median for similar projects.
Who designed the interior for this office space?
KDS de stijl interiors LLC was the design firm of record. They are also involved in other TDLR-registered projects in the Austin and Round Rock areas.
Where is the project located?
The project is at 4129 Commercial Center Drive Bldg. 4 Suite 400 in Austin, Texas. It is in the McKinney area of Travis County, outside the FEMA floodplain.
What is Fluence Office Finish Out?
Fluence Office Finish Out is a renovation/alteration project at 4129 Commercial Center Drive Bldg. 4 Suite 400 in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior remodel of existing space
Is Fluence Office Finish Out open in Austin?
Construction on Fluence Office Finish Out is complete — TDLR records show the project passed its required accessibility inspection in Apr 2023. The building is finished and very likely open.
Where is Fluence Office Finish Out located?
Fluence Office Finish Out is located at 4129 Commercial Center Drive Bldg. 4 Suite 400, Austin, TX, 78744, in Travis County.
Who is the owner or developer of Fluence Office Finish Out?
Stream Realty is the property owner/developer of record for Fluence Office Finish Out, per its TDLR project registration.
Who is the architect or design firm for Fluence Office Finish Out?
KDS de stijl interiors LLC is the design firm of record for Fluence Office Finish Out, according to its TDLR filing.
How much does Fluence Office Finish Out cost and how big is it?
Fluence Office Finish Out has an estimated construction value of $72K and approximately 4,800 square feet (about $15/sqft), based on its TDLR filing.
Scope of Work
Interior remodel of existing space
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
4129 Commercial Center Drive Bldg. 4 Suite 400, Austin, TX, 78744
Explore the supplied address
A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.
Related Projects
Same Owner
$1.20B totalRelated City Permits
Building permits found at or near this location
Replacement of an existing water heater replace two tanked water heaters in the attic.
installing a ev charger
Replacement of existing roof system new roof system is energy code compliant. There will be no structural work.
Replacement of complete existing central heat and air system with or without duct work
Request to Disconnect for battery installation
Watch all construction in 78744 (Austin)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Austin?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.