Project intelligenceTDLR TABS2023002850Additions to Existing Building
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Terry High School Renovations + Addition in Rosenberg, TX

5500 Avenue N, Rosenberg, TX, 77471

Construction complete · Dec 2023Project Closed

Terry High School Renovations + Addition is a additions to existing building project at 5500 Avenue N, Rosenberg, in Fort Bend County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Dec 2023). The project has an estimated value of $9.0M across about 2,975 sq ft.

Estimated project value
$9.0M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
2,975 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$3.03K/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1 year
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Oct 10, 2022438 days across supplied datesDec 22, 2023

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    65 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    373 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

📰About Terry High School Renovations + Addition

Terry High School Renovations + Addition is a completed construction project located at 5500 Avenue N in Rosenberg, Texas. The filing with the Texas Department of Licensing and Regulation (TDLR) describes the scope as an Orchestra Hall Addition at the existing auditorium, along with interior renovations. The project added 2,975 square feet of new space to the existing school facility at a total estimated cost of $9,000,000.

Lamar Consolidated ISD is the owner of record for this work in Fort Bend County. The design firm of record is VLK Architects Inc, which has handled several other large-scale educational projects in the region. William T Winning served as the registered accessibility specialist for this filing. The project was registered with TDLR in October 2022, with construction beginning in December 2022.

Project Status and Financial Scale

The TDLR record shows that the agency closed the project file in December 2023, which marks the end of the accessibility review process for this construction. This scheduled build window of 373 days is longer than the county median of 155 days for similar additions to existing buildings. The estimated cost of $9,000,000 places this project in the top quarter of comparable filings in Fort Bend County, where the median estimated cost is $350,000.

The cost per square foot for this project is $3,025, which is significantly above the county median of $89 per square foot for additions to existing buildings. This high per-square-foot cost reflects the specialized nature of adding a performance hall and renovating interior spaces within an occupied school environment.

Lamar Consolidated ISD has six other TDLR-registered projects totaling $41,713,161, including work at campuses in Fulshear, Rosenberg, and Richmond. VLK Architects Inc has been the design firm for six other projects totaling $107,537,991, including schools in Katy, Flower Mound, and Lewisville. Local coverage from communityimpact.com noted plans for the rebuild of Terry High and neighboring campuses, describing the location at Spur 10 and Kiosternoff Road, though the TDLR filing specifically lists the Avenue N address for this specific addition and renovation scope.

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 77471 (Rosenberg)

One email per change. Unsubscribe in one click. Privacy.

Terry High School Renovations + Addition is a Additions to Existing Building project located at 5500 Avenue N, Rosenberg, TX 77471 in Rosenberg, Texas. The project has an estimated value of $9.0M covering 2,975 sq ft. Lamar Consolidated ISD is the property owner and VLK Architects Inc is the design firm of record. The project was registered with TDLR on October 10, 2022.

Frequently Asked Questions

Is Terry High School open?

The TDLR record indicates the construction project file was closed in December 2023. This status refers to the completion of the accessibility review for the building addition and renovations, not the operational status of the school itself.

Who is the owner of the Terry High School renovation project?

Lamar Consolidated ISD is the owner of record for the project. The design firm of record is VLK Architects Inc, and the registered accessibility specialist is William T Winning.

How much did the Terry High School addition cost?

The estimated cost for the 2,975 square foot addition and interior renovations was $9,000,000. This places the project in the top quarter of comparable construction filings in Fort Bend County.

When was the Terry High School project completed?

Construction began in December 2022. The TDLR closed the project file in December 2023, marking the end of the accessibility review process for the construction.

What is the scope of work for the Terry High School project?

The filing specifies an Orchestra Hall Addition at the existing auditorium, along with interior renovations. The project type is classified as Additions to Existing Building.

What is Terry High School Renovations + Addition?

Terry High School Renovations + Addition is a additions to existing building project at 5500 Avenue N in Rosenberg, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Orchestra Hall Addition at Existing Auditorium, Interior Renovations

Is Terry High School Renovations + Addition open in Rosenberg?

Construction on Terry High School Renovations + Addition is complete — TDLR records show the project passed its required accessibility inspection in Dec 2023. The building is finished and very likely open.

Where is Terry High School Renovations + Addition located?

Terry High School Renovations + Addition is located at 5500 Avenue N, Rosenberg, TX, 77471, in Fort Bend County.

Who is the owner or developer of Terry High School Renovations + Addition?

Lamar Consolidated ISD is the property owner/developer of record for Terry High School Renovations + Addition, per its TDLR project registration.

Who is the architect or design firm for Terry High School Renovations + Addition?

VLK Architects Inc is the design firm of record for Terry High School Renovations + Addition, according to its TDLR filing.

How much does Terry High School Renovations + Addition cost and how big is it?

Terry High School Renovations + Addition has an estimated construction value of $9.0M and approximately 2,975 square feet (about $3.03K/sqft), based on its TDLR filing.

Scope of Work

Orchestra Hall Addition at Existing Auditorium, Interior Renovations

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

5500 Avenue N, Rosenberg, TX, 77471

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 77471 (Rosenberg)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Rosenberg?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.