Project intelligenceTDLR TABS2023008790Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Bagby Avenue Street Improvements

from 1800 Kendrick Ln to 1821 South Valley Mills, Waco, TX, 76076

Construction complete · Mar 2026Inspection Complete

Bagby Avenue Street Improvements is a renovation/alteration project at from 1800 Kendrick Ln to 1821 South Valley Mills, Waco, in McLennan County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Mar 2026). The project has an estimated value of $440K across about 32,000 sq ft.

Estimated project value
$440K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
32,000 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$14/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
2y 10mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Jan 5, 20231,177 days across supplied datesMar 27, 2026

5 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    55 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    1,005 days after the preceding date shown.

    Source: TDLR filing

    View source record
  5. Inspection complete · TDLR filing

    The filing records completion of the accessibility inspection.

    117 days after the preceding date shown.

    Source: TDLR filing

    View source record

Inspection Complete

Final inspection completed, awaiting project closure

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 76076 (Waco)

One email per change. Unsubscribe in one click. Privacy.

Bagby Avenue Street Improvements is a Renovation/Alteration project located at from 1800 Kendrick Ln to 1821 South Valley Mills, Waco, TX 76076 in Waco, Texas. The project has an estimated value of $440K covering 32,000 sq ft. City Of Waco is the property owner and BGE Inc. is the design firm of record. The project was registered with TDLR on January 5, 2023.

Frequently Asked Questions

What is Bagby Avenue Street Improvements?

Bagby Avenue Street Improvements is a renovation/alteration project at from 1800 Kendrick Ln to 1821 South Valley Mills in Waco, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Remove / replace sidewalk and ramps 32,000 SF of sidewalk and 35 ramps

Is Bagby Avenue Street Improvements open in Waco?

Construction on Bagby Avenue Street Improvements is complete — TDLR records show the project passed its required accessibility inspection in Mar 2026. The building is finished and very likely open.

Where is Bagby Avenue Street Improvements located?

Bagby Avenue Street Improvements is located at from 1800 Kendrick Ln to 1821 South Valley Mills, Waco, TX, 76076, in McLennan County.

Who is the owner or developer of Bagby Avenue Street Improvements?

City Of Waco is the property owner/developer of record for Bagby Avenue Street Improvements, per its TDLR project registration.

Who is the architect or design firm for Bagby Avenue Street Improvements?

BGE Inc. is the design firm of record for Bagby Avenue Street Improvements, according to its TDLR filing.

How much does Bagby Avenue Street Improvements cost and how big is it?

Bagby Avenue Street Improvements has an estimated construction value of $440K and approximately 32,000 square feet (about $14/sqft), based on its TDLR filing.

Scope of Work

Remove / replace sidewalk and ramps 32,000 SF of sidewalk and 35 ramps

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

from 1800 Kendrick Ln to 1821 South Valley Mills, Waco, TX, 76076

Location by street address

Watch all construction in 76076 (Waco)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.