Clay Avenue Sidewalks Improvements 8th to 4th Streets

Clay Ave from 8th Street to 4th Street, Waco, TX, 76712

Target date passed (Sep 2026)Review Complete

Clay Avenue Sidewalks Improvements 8th to 4th Streets is a renovation/alteration project at Clay Ave from 8th Street to 4th Street, Waco, in McLennan County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Sep 2026 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $563K across about 9,000 sq ft.

Estimated project value
$563K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
9,000 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$63/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
5 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

Explore the linked construction record and source history

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Mar 27, 2026172 days across supplied datesSep 15, 2026

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    23 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    12 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    137 days after the preceding date shown.

    Source: TDLR filing

    View source record

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 76712 (Waco)

One email per change. Unsubscribe in one click. Privacy.

Clay Avenue Sidewalks Improvements 8th to 4th Streets is a Renovation/Alteration project located at Clay Ave from 8th Street to 4th Street, Waco, TX 76712 in Waco, Texas. The project has an estimated value of $563K covering 9,000 sq ft. City of Waco is the property owner and BGE Inc. is the design firm of record. The project was registered with TDLR on March 27, 2026.

Frequently Asked Questions

What is Clay Avenue Sidewalks Improvements 8th to 4th Streets?

Clay Avenue Sidewalks Improvements 8th to 4th Streets is a renovation/alteration project at Clay Ave from 8th Street to 4th Street in Waco, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: 9000 square feet of sidewalks, curb ramps and cross walks

Is Clay Avenue Sidewalks Improvements 8th to 4th Streets open in Waco?

Clay Avenue Sidewalks Improvements 8th to 4th Streets was scheduled to finish construction in Sep 2026 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.

Where is Clay Avenue Sidewalks Improvements 8th to 4th Streets located?

Clay Avenue Sidewalks Improvements 8th to 4th Streets is located at Clay Ave from 8th Street to 4th Street, Waco, TX, 76712, in McLennan County.

Who is the owner or developer of Clay Avenue Sidewalks Improvements 8th to 4th Streets?

City of Waco is the property owner/developer of record for Clay Avenue Sidewalks Improvements 8th to 4th Streets, per its TDLR project registration.

Who is the architect or design firm for Clay Avenue Sidewalks Improvements 8th to 4th Streets?

BGE Inc. is the design firm of record for Clay Avenue Sidewalks Improvements 8th to 4th Streets, according to its TDLR filing.

How much does Clay Avenue Sidewalks Improvements 8th to 4th Streets cost and how big is it?

Clay Avenue Sidewalks Improvements 8th to 4th Streets has an estimated construction value of $563K and approximately 9,000 square feet (about $63/sqft), based on its TDLR filing.

Scope of Work

9000 square feet of sidewalks, curb ramps and cross walks

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

Clay Ave from 8th Street to 4th Street, Waco, TX, 76712

Location by street address

Watch all construction in 76712 (Waco)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.