Funding type
This project involves public funds, public land, or is a Federally funded roadway project.
US 380 in Mckinney, TX
From: Airport Drive To: West of Bridge Farmer Road, Mckinney, TX, 75069
US 380 is a new construction project at From: Airport Drive To: West of Bridge Farmer Road, Mckinney, in Collin County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Mar 2026 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $31.2M across about 156,460 sq ft.
- Estimated project value
- $31.2M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 156,460 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $199/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 1y 1mo
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
Same day as the preceding date shown.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
726 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
391 days after the preceding date shown.
Source: TDLR filing
View source record
Review Complete
Design review complete, construction may proceed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 75069 (Mckinney)
One email per change. Unsubscribe in one click. Privacy.
US 380 is a New Construction project located at From: Airport Drive To: West of Bridge Farmer Road, Mckinney, TX 75069 in Mckinney, Texas. The project has an estimated value of $31.2M covering 156,460 sq ft. TxDOT District: Dallas is the property owner and K. Friese and Associates is the design firm of record. The project was registered with TDLR on March 6, 2023.
Frequently Asked Questions
What is US 380?
US 380 is a new construction project at From: Airport Drive To: West of Bridge Farmer Road in Mckinney, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Reconstruct and widen existing 4 lane to 6 lane divided roadway.
Is US 380 open in Mckinney?
US 380 was scheduled to finish construction in Mar 2026 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.
Where is US 380 located?
US 380 is located at From: Airport Drive To: West of Bridge Farmer Road, Mckinney, TX, 75069, in Collin County.
Who is the owner or developer of US 380?
TxDOT District: Dallas is the property owner/developer of record for US 380, per its TDLR project registration.
Who is the architect or design firm for US 380?
K. Friese and Associates is the design firm of record for US 380, according to its TDLR filing.
How much does US 380 cost and how big is it?
US 380 has an estimated construction value of $31.2M and approximately 156,460 square feet (about $199/sqft), based on its TDLR filing.
Scope of Work
Reconstruct and widen existing 4 lane to 6 lane divided roadway.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
From: Airport Drive To: West of Bridge Farmer Road, Mckinney, TX, 75069
Explore the supplied address
A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.
Related Projects
Watch all construction in 75069 (Mckinney)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Mckinney?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.