Project intelligenceTDLR TABS2023013420New Construction
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

US 380 in Mckinney, TX

Fr.: West of Bridge Farmer Rd. To: County Road 458, Mckinney, TX, 75069

Opening ~Mar 2027Review Complete

US 380 is a new construction project at Fr.: West of Bridge Farmer Rd. To: County Road 458, Mckinney, in Collin County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Mar 2027. The project has an estimated value of $31.2M across about 228,930 sq ft.

Estimated project value
$31.2M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
228,930 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$136/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
2y 1mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Mar 6, 20231,482 days across supplied datesMar 27, 2027

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    726 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    756 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About US 380

CSJ: 0135-03-046, etc. is a major highway reconstruction project located in McKinney, Texas. The filing identifies the work as U.S. 380, spanning from West of Bridge Farmer Road to County Road 458. TxDOT District: Dallas is the owner of record for this new construction effort, which involves reconstructing and widening the existing four-lane roadway into a six-lane divided highway.

The estimated cost for this project is $31,161,417. The work covers 228,930 square feet, resulting in a cost of $136 per square foot. This per-square-foot figure is close to the Collin County median of $120 for similar new construction filings. The total estimated cost is above the county median of $800,000 for this project type, placing it in the top quarter of comparable filings in the region.

Timeline and Design

K. Friese and Associates is the design firm of record for this undertaking. Frank Fonseca is the registered accessibility specialist associated with the TDLR filing. Construction is scheduled to start in March 2025, with a build window of 756 days. This duration is longer than the county median of 212 days for similar projects. The work is scheduled to finish in March 2027. TDLR completed plan review in March 2023, and the current status is Review Complete.

Regional Context

TxDOT District: Dallas has six other TDLR-registered projects totaling $60,982,724, including work in Addison, Dallas, Grand Prairie, and other parts of McKinney. The design firm, K. Friese and Associates, has one other registered project in McKinney with an identical estimated cost of $31,161,417. This suggests a coordinated approach to regional roadway improvements within Collin County.

The project is situated in the 75069 ZIP code, which has a population of about 39,332 residents. The median household income in this area is estimated at $82,804, and the median owner-occupied home value is $413,700. Local coverage from bizjournals.com noted the project details in a list of new North Texas projects starting in March 2023. The filing aligns with broader infrastructure development goals for the region.

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 75069 (Mckinney)

One email per change. Unsubscribe in one click. Privacy.

US 380 is a New Construction project located at Fr.: West of Bridge Farmer Rd. To: County Road 458, Mckinney, TX 75069 in Mckinney, Texas. The project has an estimated value of $31.2M covering 228,930 sq ft. TxDOT District: Dallas is the property owner and K. Friese and Associates is the design firm of record. The project was registered with TDLR on March 6, 2023.

Frequently Asked Questions

What is the primary scope of work for this project?

The project involves reconstructing and widening the existing four-lane roadway to a six-lane divided highway. This new construction aims to improve traffic flow and safety on the U.S. 380 corridor in McKinney.

When is the construction scheduled to finish?

Construction is scheduled to finish in March 2027. Work is set to begin in March 2025, with a total build window of 756 days for the completion of the roadway improvements.

Who is the owner and design firm for this project?

The owner of record is TxDOT District: Dallas. The design firm of record is K. Friese and Associates. Frank Fonseca is the registered accessibility specialist listed on the TDLR filing.

Is the business open or operating?

The project is a highway reconstruction and not a commercial business opening. The status is Review Complete with construction scheduled to start in March 2025 and finish in March 2027.

How does the cost compare to other projects in Collin County?

The estimated cost of $31,161,417 is above the county median for this type of new construction. The cost per square foot of $136 is close to the county median of $120.

What is US 380?

US 380 is a new construction project at Fr.: West of Bridge Farmer Rd. To: County Road 458 in Mckinney, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Reconstruct and widen existing 4 lane to 6 lane divided roadway.

Is US 380 open in Mckinney?

US 380 is still under construction in Mckinney, TX, with an estimated completion of Mar 2027 according to its TDLR registration.

Where is US 380 located?

US 380 is located at Fr.: West of Bridge Farmer Rd. To: County Road 458, Mckinney, TX, 75069, in Collin County.

Who is the owner or developer of US 380?

TxDOT District: Dallas is the property owner/developer of record for US 380, per its TDLR project registration.

Who is the architect or design firm for US 380?

K. Friese and Associates is the design firm of record for US 380, according to its TDLR filing.

How much does US 380 cost and how big is it?

US 380 has an estimated construction value of $31.2M and approximately 228,930 square feet (about $136/sqft), based on its TDLR filing.

Scope of Work

Reconstruct and widen existing 4 lane to 6 lane divided roadway.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

Fr.: West of Bridge Farmer Rd. To: County Road 458, Mckinney, TX, 75069

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 75069 (Mckinney)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Mckinney?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.