McCoy Student Success Center
๐Project Metrics
TDLR #TABS2023016778Project Closed
Project has been completed and closed
๐Scope of Work
McCoy Classroom 111 and Student Organization Room 110 are under construction for the new McCoy Student Success Center. The new space will have five (5) private offices, one (1) conference room, one (1) interview room, one (1) custom reception desk, a
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐Related Projects
๐คSame Owner
$4.3M total๐Related City Permits
Building permits found at or near this location
Replacement of complete existing central heat and air system with or without duct work
Installing a power supply cabinet for Spectrum utility.
new irrigation installation ref 2025-112917 W ref 2024-105304 BP
Addition/remodel. Comprehensive interior remodel of 1st floor living spaces. Addition of a stairwell to finished 2nd floor/attic. Addition of one new dormer on north side of roof. Reconstruct original front porch and stair. Remove existing unpermitted covered deck to be replaced with new uncovered wood deck. New roof repair of siding windows and doors. Reconstruct chimney. Addition/remodel will result in a 3 bedroom 2 bathroom single family residence.
Addition/remodel. Comprehensive interior remodel of 1st floor living spaces. Addition of a stairwell to finished 2nd floor/attic. Addition of one new dormer on north side of roof. Reconstruct original front porch and stair. Remove existing unpermitted covered deck to be replaced with new uncovered wood deck. New roof repair of siding windows and doors. Reconstruct chimney. Addition/remodel will result in a 3 bedroom 2 bathroom single family residence.