Project intelligenceTDLR TABS2023017619New Construction
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Southside Fire Station in Fort Stockton, TX

608 W. 2nd Street, Fort Stockton, TX, 79735

Construction complete · Apr 2024Project Closed

Southside Fire Station is a new construction project at 608 W. 2nd Street, Fort Stockton, in Pecos County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Apr 2024). The project has an estimated value of $2.8M across about 10,000 sq ft.

Estimated project value
$2.8M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
10,000 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$275/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
11 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Apr 26, 2023370 days across supplied datesApr 30, 2024

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    36 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    334 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 79735 (Fort Stockton)

One email per change. Unsubscribe in one click. Privacy.

Southside Fire Station is a New Construction project located at 608 W. 2nd Street, Fort Stockton, TX 79735 in Fort Stockton, Texas. The project has an estimated value of $2.8M covering 10,000 sq ft. Pecos County is the property owner and JSA Architects, Inc. is the design firm of record. The project was registered with TDLR on April 26, 2023.

Frequently Asked Questions

What is Southside Fire Station?

Southside Fire Station is a new construction project at 608 W. 2nd Street in Fort Stockton, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Construction of a new metal building with storage spaces and a restroom as well as associated site improvements.

Is Southside Fire Station open in Fort Stockton?

Construction on Southside Fire Station is complete — TDLR records show the project passed its required accessibility inspection in Apr 2024. The building is finished and very likely open.

Where is Southside Fire Station located?

Southside Fire Station is located at 608 W. 2nd Street, Fort Stockton, TX, 79735, in Pecos County.

Who is the owner or developer of Southside Fire Station?

Pecos County is the property owner/developer of record for Southside Fire Station, per its TDLR project registration.

Who is the architect or design firm for Southside Fire Station?

JSA Architects, Inc. is the design firm of record for Southside Fire Station, according to its TDLR filing.

How much does Southside Fire Station cost and how big is it?

Southside Fire Station has an estimated construction value of $2.8M and approximately 10,000 square feet (about $275/sqft), based on its TDLR filing.

Scope of Work

Construction of a new metal building with storage spaces and a restroom as well as associated site improvements.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

608 W. 2nd Street, Fort Stockton, TX, 79735

Loading location map…
30.88638, -102.88477

Watch all construction in 79735 (Fort Stockton)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Fort Stockton?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.