2023 Capa-Up Electrical - 2PU-23A18-A02 Panel Refeed
2023 Capa-Up Electrical - 2PU-23A18-A02 Panel Refeed is a renovation/alteration project at 12100 Samsung Blvd., Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Aug 2023). The project has an estimated value of $422K across about 1,000 sq ft.
Project Metrics
TDLR #TABS2023019441Project Closed
Project has been completed and closed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 78754 (Austin)
One email per change. Unsubscribe in one click. Privacy.
2023 Capa-Up Electrical - 2PU-23A18-A02 Panel Refeed is a Renovation/Alteration project located at 12100 Samsung Blvd., Austin, TX 78754 in Austin, Texas. The project has an estimated value of $422K covering 1,000 sq ft. Samsung is the property owner and Fuse Architecture Studio is the design firm of record. The project was registered with TDLR on May 18, 2023.
Frequently Asked Questions
What is 2023 Capa-Up Electrical - 2PU-23A18-A02 Panel Refeed?
2023 Capa-Up Electrical - 2PU-23A18-A02 Panel Refeed is a renovation/alteration project at 12100 Samsung Blvd. in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Relocating existing 500kVA transformer and 1200A panel.
Is 2023 Capa-Up Electrical - 2PU-23A18-A02 Panel Refeed open in Austin?
Construction on 2023 Capa-Up Electrical - 2PU-23A18-A02 Panel Refeed is complete — TDLR records show the project passed its required accessibility inspection in Aug 2023. The building is finished and very likely open.
Where is 2023 Capa-Up Electrical - 2PU-23A18-A02 Panel Refeed located?
2023 Capa-Up Electrical - 2PU-23A18-A02 Panel Refeed is located at 12100 Samsung Blvd., Austin, TX, 78754, in Travis County.
Who is the owner or developer of 2023 Capa-Up Electrical - 2PU-23A18-A02 Panel Refeed?
Samsung is the property owner/developer of record for 2023 Capa-Up Electrical - 2PU-23A18-A02 Panel Refeed, per its TDLR project registration.
Who is the architect or design firm for 2023 Capa-Up Electrical - 2PU-23A18-A02 Panel Refeed?
Fuse Architecture Studio is the design firm of record for 2023 Capa-Up Electrical - 2PU-23A18-A02 Panel Refeed, according to its TDLR filing.
How much does 2023 Capa-Up Electrical - 2PU-23A18-A02 Panel Refeed cost and how big is it?
2023 Capa-Up Electrical - 2PU-23A18-A02 Panel Refeed has an estimated construction value of $422K and approximately 1,000 square feet (about $422/sqft), based on its TDLR filing.
Scope of Work
Relocating existing 500kVA transformer and 1200A panel.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Compliance Timeline
Project Timeline
Filed
May 18, 2023
Review Complete
Inspection Complete
Closed
Aug 1, 2023
Related Projects
Same Owner
$84.7M totalRelated City Permits
Building permits found at or near this location
Replacement of complete existing central heat and air system with or without duct work HVAC change out is in the hallway of the 4th floor of the main office building. No unit number.
NEW RESIDENTIAL IRRIGATION SYSTEM
Installing a new irrigation system
1360BR NEW 3 BEDROOM 2 BATH SINGLE FAMILY RESIDENTIAL HOME WITH ATTACHED GARAGE COVERED FRONT PORCH AND REAR PATIO
Home builders loop Ref: 2026-063452 EP ETJ
Property Owner
Design Firm
Registered Accessibility Specialist
Travis County Economy
Explore Area
Watch all construction in 78754 (Austin)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.