Baylor Scott & White Austin OR #3 Equipment Fit Out
๐Project Metrics
TDLR #TABS2024002563Project Closed
Project has been completed and closed
๐Scope of Work
Equipment fit-out of already built-out OR#3 and connection to existing infrastructure. Additionally 590 sf of flooring will be replaced.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐Related Projects
๐คSame Owner
$148.8M total๐Related City Permits
Building permits found at or near this location
Replacement of a large format analyzer requiring demolition of a wall and the installation of temporary electrical power data ports and floor sink. The HVAC will be rebalanced
Replacement of a large format analyzer requiring demolition of a wall and the installation of temporary electrical power data ports and floor sink. The HVAC will be rebalanced
Replacement of a large format analyzer requiring demolition of a wall and the installation of temporary electrical power data ports and floor sink. The HVAC will be rebalanced
Install set of illuminated channel letters onto North elevation reading Emergency.
First time finish-out of an existing unoccupied shell space on 3rd floor to serve as a staff respite area (Oasis Room)