Funding type
This project involves public funds, public land, or is a Federally funded roadway project.
Franklin Ave. (CSJ: 0909-22-197) in Waco, TX
From: S. 17th Street To: S. 18th Street, Waco, TX, 76701
Franklin Ave. (CSJ: 0909-22-197) is a new construction project at From: S. 17th Street To: S. 18th Street, Waco, in McLennan County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Oct 2026). The project has an estimated value of $177K across about 2,343 sq ft.
- Estimated project value
- $177K
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 2,343 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $75/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 1 year
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
5 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
87 days after the preceding date shown.
Source: TDLR filing
View source recordInspection complete · TDLR filing
The filing records completion of the accessibility inspection.
366 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
Same day as the preceding date shown.
Source: TDLR filing
View source recordProject closed · TDLR filing
The project record was closed in TDLR.
639 days after the preceding date shown.
Source: TDLR filing
View source record
📰About Franklin Ave. (CSJ: 0909-22-197)
TxDOT District: Waco completed new construction for traffic signal improvements on Franklin Avenue between S. 17th Street and S. 18th Street in Waco. The project, registered with TDLR under CSJ: 0909-22-197, has a final status of Project Closed. The work involved installing or upgrading traffic signals on this segment of the roadway, a scope that fits within the broader infrastructure maintenance efforts of the Texas Department of Transportation.
The estimated cost for this specific filing was $176,593. This figure places the project in the bottom quarter of estimated costs for new construction filings in McLennan County over the last 24 months, where the median estimated cost was $977,500. The project also reported a square footage of 2,343 sq ft, resulting in a computed cost of $75 per square foot. This is below the county median of $145 per square foot for similar new construction projects. The scheduled build window was 366 days, which is longer than the county median of 245 days for new construction filings.
Maldonado-Burkett, LLP served as the design firm of record for this project. The firm has one other TDLR-registered project in the database, a $235,000 project on SH 317 in McGregor that is marked as inspection complete. TxDOT District: Waco has six other TDLR-registered projects totaling $5,619,933, including work in Belton and Clifton, all of which are marked as review complete. The Franklin Avenue project was registered with TDLR in October 2023, with construction starting in January 2024.
The project reached its completion date in January 2025, and the final inspection passed in the same month. This marks the end of the active construction phase for this specific filing. TDLR closed the project file in October 2026, which marks the end of the accessibility review process for this construction. The project involves public funds, public land, or is a Federally funded roadway project, indicating its role within the state’s transportation network.
Project Details and Context
The location, ZIP 76701, is in McLennan County. U.S. Census ACS 2023 five-year estimates for this ZIP code indicate a population of about 1,732, with a median household income of $24,593. There are 1,029 housing units in the area, and housing is predominantly renter-occupied. These figures provide context for the community served by the traffic signal improvements on Franklin Avenue. The project’s scope was strictly limited to traffic signal improvements, without additional structural construction or expansion of the roadway itself.
The cost per square foot of $75 is notably lower than the county median, reflecting the specialized nature of traffic signal installation compared to general building construction. The longer build window of 366 days may account for the complexity of coordinating traffic signal upgrades in an active urban corridor. The project’s closure in October 2026 signifies that all regulatory and accessibility reviews have been finalized and documented in the TDLR system.
Project Closed
Project has been completed and closed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 76701 (Waco)
One email per change. Unsubscribe in one click. Privacy.
Franklin Ave. (CSJ: 0909-22-197) is a New Construction project located at From: S. 17th Street To: S. 18th Street, Waco, TX 76701 in Waco, Texas. The project has an estimated value of $177K covering 2,343 sq ft. TxDOT District: Waco is the property owner and Maldonado-Burkett, LLP is the design firm of record. The project was registered with TDLR on October 6, 2023.
Frequently Asked Questions
What is the current status of the Franklin Avenue traffic signal project?
The project is closed. TDLR closed the project file in October 2026, marking the end of the accessibility review process. The final inspection passed in January 2025.
Who is the owner of record for this construction?
The owner of record is TxDOT District: Waco. The design firm of record is Maldonado-Burkett, LLP.
What was the estimated cost of this project?
The estimated cost was $176,593. This is below the county median for new construction in McLennan County, which was $977,500.
When did construction start and finish?
Construction started in January 2024 and the completion date was January 2025. The final inspection passed in January 2025.
Is the business or facility open?
The TDLR record indicates the construction project is closed and the final inspection passed in January 2025. The record does not provide information on business opening status.
What is Franklin Ave. (CSJ: 0909-22-197)?
Franklin Ave. (CSJ: 0909-22-197) is a new construction project at From: S. 17th Street To: S. 18th Street in Waco, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Traffic signal improvements on Franklin Ave.
Is Franklin Ave. (CSJ: 0909-22-197) open in Waco?
Construction on Franklin Ave. (CSJ: 0909-22-197) is complete — TDLR records show the project passed its required accessibility inspection in Oct 2026. The building is finished and very likely open.
Where is Franklin Ave. (CSJ: 0909-22-197) located?
Franklin Ave. (CSJ: 0909-22-197) is located at From: S. 17th Street To: S. 18th Street, Waco, TX, 76701, in McLennan County.
Who is the owner or developer of Franklin Ave. (CSJ: 0909-22-197)?
TxDOT District: Waco is the property owner/developer of record for Franklin Ave. (CSJ: 0909-22-197), per its TDLR project registration.
Who is the architect or design firm for Franklin Ave. (CSJ: 0909-22-197)?
Maldonado-Burkett, LLP is the design firm of record for Franklin Ave. (CSJ: 0909-22-197), according to its TDLR filing.
How much does Franklin Ave. (CSJ: 0909-22-197) cost and how big is it?
Franklin Ave. (CSJ: 0909-22-197) has an estimated construction value of $177K and approximately 2,343 square feet (about $75/sqft), based on its TDLR filing.
Scope of Work
Traffic signal improvements on Franklin Ave.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
From: S. 17th Street To: S. 18th Street, Waco, TX, 76701
Explore the supplied address
A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.
Related Projects
Watch all construction in 76701 (Waco)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Waco?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.